(1)

Section BB 1:200

(2)

Section CC 1:200

Plan 1:200

(3)

Section AA 1:200 Plan DD 1:200

(4)

Situation map 1:3000 1

2 3

4

5

1. The stone factory 2. Quarry waste-pile

3. Workshops and storage of “raw-blocks”

4. Gravel production from waste material 5. Garage

Roof plan 1:500

Diamond-wire saw cutting slope Diamond-wire saw cutting from one side

The factory producing building- and paving-stones from waste material The Quarry extraction process

Developing a new quarry clearing the top surface clearing the facing

surface Start sawing the base of

the block then sawing the sides of

the block

cut the large block into smaller blocks, about 8x6x2 m

the blocks are divided into smaller blocks for

transporting

the blocks are divided by the intention to use as much of the stone as possible and to avoid

“mistakes”

preferable raw block dimensions are

1500 x 1800 x 3000 mm.

The blocks containing flaws or unwanted shapes are discarded to the waste pile.

clearing and preparing

the size of the block drilling holes insert diamond wire through holes

1.

2.

1. Splitting line: large splitting machine; medium splitting machine; two smaller splitting machines 2. Saw line: Large wire saw; Water jet for surface finishing; Multi-blade saw

Stone considered waste

Finished products in sizes up to 1 x 1 x 2,5 m.

(5)

100 years ago

100 years in the future Quarry today

The quarry in the past, present, and future:

1:500

100 years ago

100 years in the future Quarry today

The quarry in the past, present, and future:

1:500

Referanser

RELATERTE DOKUMENTER

Waste Electrical and Electronic Equipment (WEEE) and e-waste are the two more frequently used terms 35.. for discarded devices and appliances that use

Location Village / WardType of facilityDispensary Health Centre Hospital Number of births in the year 2000 Number of Caesarean Sections in the year 2000.. Ownership

The pile foundations are particularly sensitive to permafrost temperatures and an increase in ground temperature along an existing pile is very likely to reduce its bearing capacity

The objectives of this paper include: (1) to describe single pile and tripod-pile centrifuge model tests under different loading conditions; (2) to observe the lateral responses of

tran nosetran Sildetran Sild, fersk rekt saltet fersk fersk ål fersk fisk Hummer Reker saltet saltet Sildemel levermel, tm. islandsk klipp- omstående

Efterspørslen efter denne artikel var meget liten og dette i forbindelse med den høje saltpris bevirket, at der ikke blev tilberedt saa meget til eksport, som

FARKOSTENS LENGDE BRED BR .TONN ÅR MOTOR EIER (DEN KORRESPONDERENDE REDER) NiDNER ART OG NAVN M.. NAVN

Numbers in the ‘ PilE ’ column indicate the genomic distance between pilE and pilA1 homologues (e.g. 1 denotes pilE and pilA1 are contiguous in the genome; 0 denotes the same gene