Diploma project : spring 2021 Fabian Granhaugen
A home for elderly
Norway will in a short time face a challenge as the population will develop from 2018 to 2040 and will be dominated by people who are 80 years or old- er. Today, this group of age represents 4.2 percent of the population. In 2040, this group of age will represent as much 8 percent of the population in Norway (Helsedirektoratet 2018).
Based on this development, it is expected that there will be more elderly people than children by the year 2040. As a society, we must prepare for this development and build more nursing
homes. According to how today’s nursing homes are built, there is little variation in architectural solutions. Nursing homes as a typology are
characterized by repetitive organization with patient rooms, long corridors and few spatial qualities. In continuation of this, I have chosen to develop an alternative architectural solution where I challenge the current conventions.
Introduction
Program
Entrance :
reception 21 m2 Access room 53 m2 Visitor room 56 m2 shared room 155 m2
Treatment :
Medicine room 21,25 m2 Doctor room 21,25 m2
Physiotherapist room 21,25 m2 Employees 8 :
Staff office 21,25 m2 Meeting room 25,75 m2 Break room / Kitchen 17 m2 Laundry room 4,5 m2 Wardrobe 4,25 m2
Toilet 18 m2
Patients X 12 :
Patientroom 204 m2 Wardrobe 4,25 51 m2 Toilet 4,5 54 m2
Shed 70 m2
Patient + Employees
Living room 262 m2
Kitchen 28 m2
Dining room 118 m2 Activity room 154 m2 Sirculation :
Staircase 43,2 m2 Elevator 27 m2 Parking garage : 114 m2
Early sketch of architectural idea / showing the potensial of irregularity.
a-a
b-b b-b
c-c
b-b
a-a a-a
c-c
c-c c-c
a-a
b-b
1.100 Long section 1 3
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
3
1.100 Long section 1
1 3
Plan 1.100 1-2 st. floor Plan 1.100 ground floor 1 3
1.100 Long section a-a 1 3 5
1.100 Axometric structure 3 5
1.100 Long section c-c 3 5
3
1.100 Long section c-c 1
1.50 detail section
1 3 5
Plan 1.100 basement
5 3
1 3 5
1.200 Elevation south
1.200 elevation east
15 1
1
5 5
5 5
Conceptual drawing showing the idea of a continuous wall
1. Location : The home for elderly 2. Access site
3. Ullevåll Sykehus
1 3
2
Innkj
ring parkering
Thulstrupsgate
hovedinngang
2 6 10
Atrium
d-d d-d
d-d d-d
c-c c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Sliding door profile vented cavity / dranage Vented cavity
Two-layer glass
3 5
1.100 Long section 1
Clt cladding Metal coping
Fall roof
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing
Vapor barrier Drainage barrier Lath for cornice
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
1.10 Wall section
1.200 elevation east
1.200 Elevation south
1 53 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section
3
1 3 5
1 2
4 3 4
7 5 8
9 10
6
1. Access room
2. Reception 3. Visitor room
4. Shared space 5. Staff office
6. Staff room / Laundry 7. Meeting room
8. Doctor room 9. Physiotherapist room 10. Medicine room
d-d d-d
d-d d-d
c-c c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Sliding door profile vented cavity / dranage Vented cavity
Two-layer glass
3 5
1.100 Long section 1
Clt cladding Metal coping
Fall roof
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing
Vapor barrier Drainage barrier Lath for cornice
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
1.10 Wall section
1.200 elevation east
1.200 Elevation south
1 53 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section
3
1 3 5
1. Patient room
2. Dining room 3. Living room
4. Dining room 5. Activity room
1
2 3
3 5 4
d-d d-d
d-d d-d
c-c c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Sliding door profile vented cavity / dranage Vented cavity
Two-layer glass
3 5
1.100 Long section 1
Clt cladding Metal coping
Fall roof
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing
Vapor barrier Drainage barrier Lath for cornice
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
1.10 Wall section
1.200 elevation east
1.200 Elevation south
1 53 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section
3
1 3 5
1
3 2
4 2
1. Parking entrance
2. Technical room 3. Parking 4. Shed
c-c
b-b
b-b
a-a
c-c c-c
b-b
a-a
a-a a-a
c-c
b-b
1.200 elevation east
5
1 3
Two-layer glass Metal coping
Aeration layer
Fall roof
Areation layer / dranage Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Floor framing
Vapor barrier Drainage barrier
1.10 Wall section
1.100 Long section c-c
3
5
3 5
1 1
5
1.100 Axometric structure
5 1
1
3 5
1.100 Long section 1
1.100 Long section a-a
3
1.100 Long section c-c
1.100 Long section 1 5
3 5
1
Plan 1.100 basement
5
Plan 1.100 1-2 st. floor
c + 0 c + 0,43 c + 3,78 c + 7,13
3 3
3 5 1
5
c + 10
1
3
Plan 1.100 ground floor
1.50 detail section
3
1
Lath for cornice
Elastic polyurethane Metal railing Sliding door profile
1.200 Elevation south
d-d d-d
d-d d-d
c-c c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Sliding door profile vented cavity / dranage Vented cavity
Two-layer glass
3 5
1.100 Long section 1
Clt cladding Metal coping
Fall roof
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing
Vapor barrier Drainage barrier Lath for cornice
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
1.10 Wall section
1.200 elevation east
1.200 Elevation south
1 53 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section
3
1 3 5
4 7
7 6
6 5
5
3 2 1
8 9
1. Access room
2. Reception 3. Visitor room
4. Shared space 5. Kitchen & dining room
6. Living room 7. Activity room
8. Parking 9. Stairs & elevator core
a-a b-b
b-b c-c
a-a a-a
b-b c-c
c-c
b-b c-c
a-a
1 3 5
1.100 Long section d-d
c + 10
c + 7,13
c + 3,78
c + 0
1.100 Long section 1 3
1.100 Long section d-d
1.10 Wall section Drainage barrier
Vapor barrier Floor framing Elastic polyurethane Cross laminated timber 150 mm Cross laminated timber 150 mm Steel profile for fixing the cover egde XPS ISOLATION 300 mm Gluelam beam 200 x 600 mm Areation layer / dranage Aeration layer Metal coping
Two-layer glass
3 5
1.100 Long section 1
1 3 5
5
Plan 1.100 1-2 st. floor 3 Plan 1.100 ground floor 3 5
1.100 Long section a-a 1 3 5
1.100 Axometric structure 1 3 5
1 3 5
5
1.100 Long section c-c 1
1 3 5
Plan 1.100 basement
1 3 5
5
1.200 Elevation south
31.200 elevation east
1 3 5
1
1.50 detail section
3
1.100 Long section c-c
1 1
Sliding door profile
Fall roof
Metal railing Lath for cornice
5
c + 0,43
1.100 Long section d-d
a-a b-b
b-b c-c
a-a a-a
b-b c-c
c-c
b-b c-c
a-a
1 3 5
1.100 Long section d-d
c + 10
c + 7,13
c + 3,78
c + 0
1.100 Long section 1 3
1.100 Long section d-d
1.10 Wall section Lath for cornice
Drainage barrier Vapor barrier Floor framing Elastic polyurethane Cross laminated timber 150 mm Cross laminated timber 150 mm Steel profile for fixing the cover egde XPS ISOLATION 300 mm Gluelam beam 200 x 600 mm Areation layer / dranage Aeration layer Metal coping
Two-layer glass
3 5
1.100 Long section 1
1 3 5
5
Plan 1.100 1-2 st. floor 3 Plan 1.100 ground floor 3 5
1 3 5
1.100 Axometric structure 1 3 5
1 3 5
1 5
1.100 Long section c-c
1 3 5
Plan 1.100 basement
1 3 5
5
1.200 Elevation south
31.200 elevation east
1 3 5
1
1.50 detail section
3
1.100 Long section c-c 1.100 Long section a-a
1 1
Sliding door profile
Fall roof
Metal railing
5
c + 0,43
1.100 Long section d-d
c-c
b-b
b-b
a-a
c-c c-c
b-b
a-a
a-a a-a
c-c
b-b
1.200 elevation east
5
1 3
Two-layer glass Metal coping
Aeration layer Fall roof
Areation layer / dranage Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Floor framing
Vapor barrier Drainage barrier
1.10 Wall section
1.100 Long section c-c
3
5
3 5
1 1
5
1.100 Axometric structure
5 1
1
3 5
1.100 Long section 1
1.100 Long section a-a
3
1.100 Long section c-c
1.100 Long section 1 5
3 5
1
Plan 1.100 basement
5
Plan 1.100 1-2 st. floor
c + 0 c + 0,43 c + 3,78 c + 7,13
3 3
3 5 1
5
c + 10
1
3
Plan 1.100 ground floor
1.50 detail section
3
1
Lath for cornice
Elastic polyurethane Metal railing Sliding door profile
1.200 Elevation south
d-d d-d d-d c-c
c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
d-d
Sliding door profile vented cavity / dranage
3 5
1.100 Long section 1
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
Two-layer glass Metal coping
Fall roof
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing
Vapor barrier Drainage barrier Lath for cornice
1.10 Wall section
1.200 elevation east
1.200 Elevation south
1 3 53 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section 1 3 5
Vented cavity
Clt cladding
c-c c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Cross laminated timber 150 mm
Two-layer glass
Elastic polyurethane Drainage barrier Floor framing Metal coping
Aeration layer Lath for cornice
Fall roof
3 5
1.100 Long section 1
Sliding door profile Areation layer / dranage Gluelam beam 200 x 600 mm
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
XPS ISOLATION 300 mm
Metal railing
1.200 elevation east
1.200 Elevation south
1 3 53 5
1
Plan 1.100 basement
1 3 51.50 detail section
1.100 Long section c-c
1 3 53 5
1.100 Long section c-c
13 5
1.100 Axometric structure
13 5
1.100 Long section a-a
1Plan 1.100 ground floor
1 3 5Plan 1.100 1-2 st. floor
1 3 5Steel profile for fixing the cover egde
1.100 Long section
1 3 5Cross laminated timber 150 mm
Vapor barrier
1.10 Wall section
d-d d-d d-d d-d c- c
c-c
b-b
b-b
a-a a-a
c-c c-c
b-b
b-b
a-a a-a
Sliding door profile
Two-layer glass Metal coping
Fall roof
3 5
1.100 Long section 1
Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm
Metal railing Steel profile for fixing the cover egde
Cross laminated timber 150 mm Cross laminated timber 150 mm
Elastic polyurethane Floor framing vented cavity / dranage
Vapor barrier Drainage barrier Lath for cornice
Vented cavity
1.10 Wall section
c + 0 c + 0,43 c + 3,78 c + 7,13 c + 10
Clt cladding
1.200 elevation east
1.200 Elevation south 1 3 5
3 5
1
Plan 1.100 basement 1 3 5
1.50 detail section
1.100 Long section c-c 1 3 5
3 5
1.100 Long section c-c 1
3 5
1.100 Axometric structure 1
3 5
1.100 Long section a-a 1
Plan 1.100 ground floor 1 3 5
Plan 1.100 1-2 st. floor 1 3 5
1.100 Long section 1 3 5
c-c
b-b
b-b
a-a
c-c c-c
b-b
a-a
a-a a-a
c-c
b-b
1.200 elevation east
5
1 3
Two-layer glass Metal coping
Aeration layer Fall roof
Areation layer / dranage Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm Steel profile for fixing the cover egdeCross laminated timber 150 mm Cross laminated timber 150 mm
Floor framing
Vapor barrier Drainage barrier
1.10 Wall section
1.100 Long section c-c
3
5
3 5
1 1
5
1.100 Axometric structure
5 1
1
3 5
1.100 Long section 1
1.100 Long section a-a
3
1.100 Long section c-c
1.100 Long section 1 5
3 5
1
Plan 1.100 basement
5
Plan 1.100 1-2 st. floor
c + 0 c + 0,43 c + 3,78 c + 7,13
3 3
3 5 1
5
c + 10
1
3
Plan 1.100 ground floor
1.50 detail section
3
1
Lath for cornice
Elastic polyurethane Metal railing Sliding door profile
1.200 Elevation south
c-c
b-b
b-b
a-a
c-c c-c
b-b
a-a
a-a a-a
c-c
b-b
1.200 elevation east
5
1 3
Two-layer glass Metal coping
Aeration layer Fall roof
Areation layer / dranage Gluelam beam 200 x 600 mm XPS ISOLATION 300 mm Steel profile for fixing the cover egdeCross laminated timber 150 mm Cross laminated timber 150 mm
Floor framing
Vapor barrier Drainage barrier
1.10 Wall section
1.100 Long section c-c
3
5
3 5
1 1
5
1.100 Axometric structure
5 1
1
3 5
1.100 Long section 1
1.100 Long section a-a
3
1.100 Long section c-c
1.100 Long section 1 5
3 5
1
Plan 1.100 basement
5
Plan 1.100 1-2 st. floor
c + 0 c + 0,43 c + 3,78 c + 7,13
3 3
3 5 1
5
c + 10
1
3
Plan 1.100 ground floor
1.50 detail section
3
1
Lath for cornice
Elastic polyurethane Metal railing Sliding door profile
1.200 Elevation south
Illustration of physical model