Optimal Risk Adoption and Capacity Investment in Technological Innovations

Lars H. Sendstad , Michail Chronopoulos , and Verena Hagspiel

Abstract—Technological innovations often formulate new mar- ket regimes and create incentives to abandon existing, less at- tractive ones. However, this decision depends not only on market forces, such as economic and technological uncertainty, but also on attitudes toward risk. Although greater risk aversion typically raises the incentive to postpone investment, the impact of risk aversion becomes more complex when a firm has discretion over both the timing and the size of a project. We develop a utility-based regime-switching framework in order to analyze how a firm with discretion over investment timing and project scale may choose to abandon an existing market regime to enter a new one. Results indicate that greater risk aversion hastens investment in an existing regime by decreasing the amount of installed capacity, but delays its abandonment, thereby hindering the transition to a new one.

In contrast, greater demand uncertainty in the new market regime raises the value of the investment opportunity and, in turn, the incentive to abandon the existing regime. Furthermore, we find that uncertainty over the arrival of a technological innovation may accelerate investment in the existing regime and reduce the relative loss in project value in the absence of managerial discretion over project scale.

Index Terms—Investment analysis, real options, regime switching, risk aversion, technological innovation.

I. INTRODUCTION

I

N THE past few decades, the rapid pace of innovation and intense research and development (R&D) activities in many industries, such as information technologies, renewable energy (RE), and telecommunications, has resulted in several technological innovations. Examples include the major change that the photography industry underwent in the 1990s, when the traditional film was replaced by digital photography. Kodak, one of the major market players in the USA for traditional film, failed to keep up with many of the innovations brought by the digital era. As digital cameras became popular and reduced the need for photographic film, Kodak filed for bankruptcy in 2012 [37].

Manuscript received August 20, 2020; revised December 26, 2020; accepted January 27, 2021. This work was supported by the Research Council of Norway under Grants 268093 and 274569. Review of this manuscript was arranged by Department Editor D. Cetindamar.(Corresponding author: Lars H. Sendstad.) Lars H. Sendstad and Verena Hagspiel are with the Department of Industrial Economics and Technology Management, Norwegian University of Science and Technology, 7491 Trondheim, Norway (e-mail: [email protected];

[email protected]).

Michail Chronopoulos is with the Cass Business School, City University of London, London EC1Y 8TZ, U.K., and also with the Department of Business and Management Science, Norwegian School of Economics, 5045 Bergen, Norway (e-mail: [email protected]).

Digital Object Identifier 10.1109/TEM.2021.3056142

Similarly, Nokia’s slow reaction to adopting prominent mobile software and positioning itself strategically next to Apple and Samsung led to a decline in profits. However, through a strategic sale of its failing handset business, Nokia acquired sufficient capital to pivot into the network equipment industry through several major acquisitions [38].

Similarly, in the energy sector, RE technologies are rapidly es- tablishing a presence in the energy market and are becoming less reliant upon heavy subsidies or other policy interventions [40].

This green growth is transforming energy markets throughout the world and has led many companies to alter their investment strategies, drastically. For example, Scottish Power, one of the big six U.K. energy firms, has recently decided to completely abandon fossil fuels in favor of wind power [25]. Also, Ørsted, a Danish energy company that was operating in dwindling North sea fields for oil and gas with ailing connected gas and coal power plants, shed all its fossil fuel assets and used the proceeds to enter the RE industry through wind farm investments [39].

The aforementioned examples illustrate how timely technol- ogy switch is key for corporate strategy, as it may determine the success or failure of a company as a whole in any industry that is subject to a rapid pace of innovation. However, this decision becomes rather complex when it entails irreversible capacity investment in the light of evolving uncertainties and risk aversion. Indeed, although an early transition to a new market regime allows a firm to limit its exposure to downside risk from remaining in a declining old market, waiting enables the firm to observe the market and make a more informed irreversible capacity investment decision.

By analyzing this tradeoff, our contribution to the existing literature is threefold.

1) We develop a utility-based regime-switching framework for analyzing the decision to invest in and subsequently abandon the existing regime due to the arrival of a tech- nological innovation;

2) We show how attitudes toward risk as well as economic and technological uncertainty impact the optimal regime- switching strategy in terms of both the optimal investment and capacity-sizing decision. Specifically, we find that risk aversion accelerates investment by raising the incentive to build a smaller project, while greater price sensitivity to project scale lowers the amount of installed capacity, thereby decreasing the incentive to abandon an existing market regime. Furthermore, we find that greater demand uncertainty in the existing (new) regime lowers (raises)

This work is licensed under a Creative Commons Attribution 4.0 License. For more information, see https://creativecommons.org/licenses/by/4.0/

(2)

the incentive to abandon the existing regime in order to invest in the new one.

3) We provide managerial insights for investment decisions based on analytical and numerical results.

The rest of this article is organized as follows. We pro- ceed by discussing some related work in Section II and in- troduce assumptions and notation in Section III. The prob- lem of investment in a new market regime is addressed in Section IV-A. In Section IV-B, we tackle the problem of abandoning an old regime in order to invest in a new one, and in Section IV-C, we analyze the problem of optimal investment and capacity sizing under regime switching. Section V provides numerical examples for each case. Finally, Section VI concludes this article.

II. RELATEDWORK

Real options theory accounts for decision making under un- certainty while reflecting the flexibility from embedded man- agerial discretion. Therefore, it has been widely adopted for analyzing problems such as the optimal entry to and exit from a project. However, formulations of these problems have been mainly developed under the assumption of complete financial markets or a risk-neutral decision maker [14], [30], [31]. Such formulations are not pertinent to analyzing investment in tech- nological innovations, since these often entail idiosyncratic risk that cannot be diversified, and therefore, decision makers may exhibit risk aversion. Indeed, the underlying commodities of such projects are not likely to be freely traded, which prevents the construction of a replicating portfolio. In turn, the assumption of hedging via spanning assets breaks down and a contingent-claim approach cannot be used for project and option valuation. Hence, analytical methods for capital budgeting and risk assessment must be developed via dynamic programming, which uses a subjective discount rate to maximize the expected discounted utility of the profits of a risk-averse decision maker.

Examples of early work that attempts to reconcile risk aver- sion with real options theory but ignores regime switching include [21], in which Henderson and Hobson extend the work of Merton [32] by introducing market incompleteness via the inclusion of a risky asset on which no trading is allowed. In the same line of work, Henderson [20] assumes that a risky asset that is correlated with the investment payoff can be used to hedge only part of the uncertainty associated with the investment payoff, so that the remaining risk is idiosyncratic. Results indi- cate that higher risk aversion or lower correlation between the project value and the hedging asset, i.e., greater idiosyncratic risk, lowers both the option value and the investment thresh- old. This happens because the decision maker wants to reduce uncertainty by locking-in a value for the investment payoff.

By contrast, Hugonnier and Morellec [22] account for a de- cision maker’s risk aversion via a constant relative risk aversion (CRRA) utility function and show that risk aversion erodes the value of a project and raises the required investment threshold.

Extensions in the same line of work that allow for operational flexibility and discretion over project scale are presented in [6]

and [7].

Regime-switching frameworks for investment under eco- nomic uncertainty that allow for attitudes toward risk but ignore Markov switching and discretion over project scale include [1]

and [2]. These frameworks assume that the structure of the underlying stochastic process may be affected by either a change in volatility while holding the drift fixed (see [2]) or a change in drift while holding the volatility constant (see [1]). Their results challenge those of the traditional real options literature by show- ing how increasing uncertainty does not necessarily decelerate investment. An extension of [1] and [2] that considers a structural change of the underlying stochastic process in terms of both the drift and the volatility is presented in [28]. More recently, Chronopoulos and Lumbreras [8] have developed a Markov regime-switching model for investment under uncertainty and find that, depending on market-regime asymmetry, greater risk aversion and price uncertainty in a new regime may accelerate regime switching. However, their model assumes an exogenous price process and ignores the flexibility to scale the size of a project.

In the area of investment and capacity sizing, examples of early work include [13] and [33]. The former considers a firm that expands its capital stock incrementally with operational flexibility, while the latter allows for discrete capacity sizing and develops a model for choosing among mutually exclusive projects under uncertainty. The decision rule of [13] involves:

1) ranking the projects by capacity; 2) finding the investment threshold for each project; and 3) selecting the largest project for which the optimal threshold exceeds the current price. In the same line of work, Dangl [11] tackles the problem of investing in a project with continuously scalable capacity and finds that demand uncertainty raises the optimal capacity and makes waiting the optimal strategy even when demand is high.

Another extension of [13] is presented by Décampset al.[12], who identify a second waiting region around the indifference point between the net present values (NPVs) of two projects.

Within this region, a firm will select the smaller (larger) project if the price drops (increases) sufficiently. Applications of these models to RE investment are presented in [5] and [16], while policy-oriented applications are described in [3] and [35]. Nev- ertheless, these models are based on the assumption of risk neutrality, and therefore, attitudes toward risk are not taken into account.

Within the context of investment in technological innovations, Hagspielet al.[19] consider a risk-neutral price-setting firm that faces both technological change and a declining profit stream.

The firm can abandon an established technology by either exiting the corresponding market regime permanently or by investing in a new one. However, the new regime is assumed to be available, and therefore, technological uncertainty is not considered. Their results indicate that, with (without) discretion over capacity, the relationship between the optimal investment threshold and economic uncertainty is monotonic (nonmonotonic). In addi- tion, they find that the firm abandons the current regime more easily when economic uncertainty is high and when the market for the innovative product is very attractive. Considering the case of electric vehicles, Lukaset al.[27] study the impact of uncertainty over the technological life cycle on the decision to

(3)

invest and scale the capacity of a project under risk neutrality.

They find that the investment threshold follows an S-curve, segmented with respect to the optimal capacity choice, which depends on the degree of product life-cycle uncertainty. Filom- enaet al.[15] analyze the problem of technology selection and capacity investment for electricity generation in a competitive environment under uncertainty, considering: 1) the portfolio of technologies; 2) each technology’s capacity; and 3) the tech- nology’s production level for every scenario. Results indicate that portfolio diversification arises even with risk-neutral firms and technologies with different cost expectations. Using plug-in electric vehicles as an example, Kauppinenet al.[26] analyze the impact of multiple sources of uncertainty on a sequential investment decision and show that lower growth rate might induce earlier investment when the time to build is relatively long.

Since attitudes toward risk and discretion over both invest- ment timing and project scale may impact the optimal investment policy significantly, we explore their interaction and combined impact in this article. The scope of our model does not include the option to choose between alternative technologies (market regimes) as in [18]. Instead, we emphasize on how demand and technological uncertainty interact to affect the decision to invest in an established market regime and subsequently abandon it in order to enter a new one. Specifically, our work builds upon and complements the framework of [8] and [19]. In [19], it is shown how higher profitability of a new technology increases the incentive to adopt it earlier but invest in smaller capacity.

However, in our setting, a more profitable new technology leads to earlier adoption yet with a higher capacity. In addition, we allow for risk aversion and technological uncertainty and find that both greater risk aversion and innovation rate accelerate technology adoption. Also, the latter demonstrates how greater price uncertainty and risk aversion may impact the timing of a regime switch, but ignore how capacity sizing decisions may be affected. Indeed, most of the results are reversed since a risk-averse firm can control its risk exposure via capacity sizing.

Consequently, the contribution to this line of work is driven by the interaction between risk aversion and discretion over project scale under demand and technological uncertainty, features that are considered separately in the existing literature. Additionally, our framework offers a methodological contribution to the liter- ature that addresses the impact of risk aversion on capacity in- vestment via a utility-based framework assuming a price-taking firm, i.e., an exogenous price process, thus ignoring the feedback effect of capacity expansion on the optimal capacity investment policy.

By incorporating attitudes toward risk via a hyperbolic ab- solute risk aversion (HARA) utility function, we find that the interaction between demand and technological uncertainty is rather strong and that market regime asymmetry can impact the decision to abandon an existing regime in order to switch to a new one, considerably. Specifically, we find that greater (lower) economic uncertainty in the new market regime raises (reduces) the value of the associated investment opportunity and increases (decreases) the incentive to abandon the existing market regime.

However, greater economic uncertainty in the existing regime

raises the value of waiting, thereby increasing the incentive to postpone abandonment and delaying entry in the new regime.

Furthermore, we show how greater likelihood of a technological innovation lowers the relative loss in value due to an incorrect capacity choice.

III. MODELSETUP

We consider a firm with a perpetual option to invest in a project of infinite lifetime facing demand and technological uncertainty.

The firm has discretion over both the time of investment and the size of the project and faces a multiplicative inverse demand function [19], [23], [36]. Thus, the price process{Pt(k), t≥0}, where tdenotes time, depends not only on the demand shock process{Θ(k)t , t≥0}, but also on the outputQt. This relation- ship is described as follows:

Pt(k)

Θ(k)t , Qt

= Θ(k)t (1−ηQt). (1)

where η is a positive constant reflecting the responsiveness of price to project scale, and k= 1,2,3 are different market regimes. In terms of context,ηshould generally be considered regime dependent; however, if the firm is using an innovative technology in the same market, η would be constant across regimes. This would be the case, for example, with offshore wind and oil production if both production technologies supplied the same energy market.

The demand shock process follows a Markov-modulated ge- ometric Brownian motion (GBM) that is described as

dΘ(tk)=μkΘ(tk)dt+σkΘ(tk)dZt, Θ(1)0 Θ>0 (2) whereμk>0denotes the annual growth rate,σk is the annual volatility, and dZt is the increment of the standard Brownian motion.

We assume that the arrival of a technological innovation follows a Poisson process{Nt, t≥0} with intensityν that is independent of {Θ(k)t , t≥0}. This is particularly relevant for firms that do not engage in R&D but invest in technologies developed by R&D companies (as the firm under consideration in this article) and want to assess the viability of an investment decision with limited information about the decisions made by R&D companies. Once an innovation takes place, two things happen: 1) Regime 3 emerges; and 2) the market parameters for the existing technology switch from Regime 1 to Regime 2.

We assume that the emergence of a new market regime reduces the attractiveness of the existing one so that μ3> μ1> μ2.1 Note that the volatility can vary among the different regimes.

Although technological breakthroughs tend to reduce the attrac- tiveness of mature technologies, the volatility associated with the new market regime may initially be higher than that in the existing regime. Similarly, the gradual deterioration of Regime 1 following the arrival of the new technology may be either steady or volatile. Therefore, we do not pose any particular restriction

1We consider the profitability in each regime to be known, and hence, we do not consider the potential to learn as time passes by Thijssen and Bregantini [41].

(4)

Fig. 1. State-transition diagram.

on the relationship betweenσ1, σ2, andσ3, but, instead, we let σ3σ1andσ2σ1.

The scenario we analyze in this article is illustrated in Fig. 1.

Here, the firm initially holds the option to invest in Regime 1, and upon exercising the option at the critical thresholdΘ(1)τ1 , it receives the expected utility of the active project in Regime 1. Once an innovation occurs, market parameter values for the existing technology switch from Regime 1 to Regime 2, while a new market regime emerges. The firm abandons the old market at the critical thresholdΘ(2)τ0 and receives the option to enter Regime 3.2Note that the irreversibility of the decision to invest in or abandon a market regime combined with demand uncertainty creates the incentive for the firm to wait for demand uncertainty to resolve by accruing relevant information before making an irreversible decision.

The firm’s preferences are described by a functional U(·) taken from the HARA class of utility functions, namely, a power function with CRRA, indicated as

U(Pt) = 1

γPtγ. (3)

However, note that our framework can accommodate a wide range of utility functions, such as a constant absolute risk aver- sion and a CRRA utility function.

The operating cost is fixed and denoted byc($/unit), and the cost of abandoning the existing regime is fixed and denoted by E ($) [4]. In contrast, the investment cost I(·)($) is a linear function of the capacity, indicated as

I(k)(Q) =b(k)Q (4) where b(k) is constant. In line with [23], we assume that the firm always produces at full capacity,Q. This is often referred to as theclearanceassumption and arises when it is costly to ramp up and down capacity or when commitments to workers and suppliers hinders temporary adjustments [19]. For ease of exposition, we setI(k)(Q)≡I(k).

Also, we leti= 0,1denote the state of the project (technol- ogy) in terms of being active (i= 1) or abandoned (i= 0). We let τi(k)denote the optimal time of investment or abandonment of a technology in Regimek(τki)denote the corresponding optimal investment threshold, and Q(k) denote the optimal capacity.

Also, Fτ(k)i (·) is the maximized expected value of the option to invest in or abandon a regime andΦ(k)τi (·)is the maximized

2The option to make a gradual transition from the old to the new market regime instead of a direct abandonment of the old regime may also be considered within the same framework, but it is not within the scope of this article.

expected utility of the active project in Regimek. For example, the time of investment in Regime 1 is denoted by τ1(1), and the corresponding optimal investment threshold and optimal capacity are denoted byΘ(1)τ1 andQ(1), respectively.

IV. MODEL

A. Regime 3

The value function within each market regime is determined via backward induction, and the optimal investment policy in each state is formulated by adopting a nested optimal stopping time approach. Therefore, we begin by assuming that, after having just exited the second regime, the firm is in an inactive state and considers investing in the third one. Note that the utility function in (3) is not separable in Pt, and therefore, following the same approach as [10] and [22], the key insight is to decompose the cash flows of the project into disjoint time intervals, as illustrated in Fig. 2. Therefore, we assume that the capital required for the realization of the project is initially invested in a risk-free asset, e.g., a certificate of deposit, and earns a risk-free rate,r, up to timeτ1(3). At timeτ1(3), the firm swaps the risk-free cash flow for the risky cash flow that the project generates and fixes the capacity of the project. We assume that the operating cost is 0 in Regime 3.3Also, we denote by ρandrthe subjective and risk-free discount rate, respectively, and assume that both discount rates are greater thanμk.4 The objective is to determine the investment policy that maximizes the time-zero expected discounted utility of all the cash flows of the project. This is indicated as follows:

EΘ

τ1(3)

0 e−ρtU

rI(3)

dt +

τ1(3)e−ρtU

Θ(3)t

1−ηQ(3)

Q(3)

dt

(5) whereEΘ[·]denotes the expectation operator conditional on the initial value of the demand shock parameter,Θ.

By decomposing the first integral in (5) and rewriting it as in (6), we note that the first term in (6) is deterministic, and therefore, the optimization objective is reflected in the second

3This can be motivated by the operation and maintenance costs of RE such as offshore wind investments, which are only about 15% of the levelized cost of energy, i.e., total cost [24].

4This assumption is required in order to ensure the convergence of the firm’s value functions [14, p. 138].

(5)

Fig. 2. Irreversible investment in Regime 3.

term

0 e−ρtU

rI(3)

dt +EΘ

τ1(3)

e−ρt

U

Θ(3)t

1−ηQ(3)

Q(3)

−U

rI(3)

dt

. (6)

Next, we rewrite the second term in (6) as in (7) using the law of iterated expectations and the strong Markov property of the GBM. The latter states that the values of the price process after timeτ1(3)are independent of the values beforeτ1(3)and depend only on the value of the process at the time of investment in Regime 3,τ1(3). The objective is to determine the first passage timeτ1(3)of the demand shock parameter through the threshold Θ(3)τ1 , i.e.,τ1(3)= inf{t >0 : ΘtΘ(3)τ1}.

F1(3)(Θ) = sup

τ1(3)∈S

EΘ

e−ρτ1(3)EΘ(3)τ

1

0 e−ρt

U

Θ(3)t

1−ηQ(3)

Q(3) −U

rI(3)

dt

. (7) Note that the inner conditional expectation’s independence from Θ(3)τ1 ) means that the two expectations in (7) may be sepa- rated, as indicated in (8). Hence, the firm’s maximized value of investment opportunity is expressed in (8) as the product of the stochastic discount factor (first term) and Φ(3)1(3)τ1 ), which denotes the expected utility of the project’s cash flows maximized with respect to capacity (second term), i.e.,

F1(3)(Θ) = sup

τ1(3)∈S

EΘ

e−ρτ1(3)

Φ(3)1 Θ(3)τ1

. (8) As shown in Proposition 1, it is possible to derive the analyt- ical expression for the expected utility of a perpetual stream of cash flows when the demand shock parameter follows a Markov-modulated GBM. In turn, this facilitates insights on how attitudes toward risk impact the expected utility of a project within a regime-switching environment and enables the anal- ysis of the feedback effect of capacity choice on price under risk aversion. This is a critical contribution to the real options literature for capacity investment under risk aversion [7] that typically assumes an exogenous price process, and, therefore, ignores the feedback effect of project scale on the output price.

Indeed, when considering how greater economic uncertainty

raises the required investment threshold and, in turn, the amount of installed capacity [11], it is crucial to account for the impact of capacity on the output price, particularly when the former increases to considerably high levels.

Proposition 1: The expected utility of a perpetual stream of cash flowsPt(tk), Q(k))Q(tk), whereΘ(tk)follows a Markov- modulated GBM, is

EΘ

0 e−ρtU

Θ(tk)

1−ηQ(k)

Q(k)

dt

=A(k)U

Θ(k)

1−ηQ(k)

Q(k)

where

A(k)= β1kβ2k

(ρ+ν1k=1) (γ−β1k) (γ−β2k)

and 1k=1 is an indicator function, while βjk are the roots of the quadratic 12σ2kβ(β−1) +μkβ−(ρ+ν1k=1) = 0,j= 1,2andk= 1,2,3.

Note that at time τ1(3), the firm exercises the investment option and must determine the optimal size of the project for the corresponding level of the demand shock parameter Θ(3)τ1. Hence, the objective of the firm when exercising its investment opportunity ismaxQ(3)Φ(3)1(3)τ1), where

Φ(3)1 Θ(3)τ

1

=

A(3)U Θ(3)τ

1

1−ηQ(3)

Q(3) 1

ρU

rI(3)

. (9) By applying the first-order necessary condition (FONC) to the unconstrained optimization problem (9), we obtain the condition for the optimal capacity. The optimal capacity for a given output price in Regime 3 is given implicitly as

ρA(3)Θ(3)τ1 γ (rb)γ

12ηQ(3) 1−ηQ(3) γ−1

= 1. (10) By settingγ= 1, we can derive the analytical expression for the optimal capacity under risk neutrality, indicated as follows:

∂Q(3)Φ(3)1 Θ(3)τ

1

= 1 2η

1−rb(r−μ3) ρΘ(3)τ1

. (11) Next, we assume that the demand shock parameter is too low to justify immediate investment, and therefore, the firm needs to wait until it hits a sufficiently high threshold. Note that we can write the stochastic discount factor asEΘ[e−ρτi(k)] = ( Θ

Θ(k)τi )βjk [14], whereβjk is the positive (β1k) or negative (β2k) root of

(6)

the quadratic 12σ2β(β−1) +μβ−(ρ+ν1k=1) = 0. There- fore,F1(3)(Θ)can be expressed, forΘ<Θ(3)τ1, as follows:

F1(3)(Θ) = max

Θ(3)τ1>Θ

Θ Θ(3)τ1

β13 Φ(3)1

Θ(3)τ1

. (12) By applying the FONC to the unconstrained optimization problem (12), we obtain the expression for the optimal in- vestment threshold that is indicated in (13). Next, by inserting (13) into (10), we derive the analytical expression for optimal capacity, as indicated in (14). Note that, under risk neutrality, (13) and (14) simplify the analytical solution for the optimal investment threshold and optimal capacity described in [23].

Note thatηonly impacts the optimal capacity as a scaling factor in Regime 3, as we will see in the numerical results; however, the optimal investment threshold is unaffected. Hence, allowing ηto be different in Regime 3 from the other regimes would only shift the value of the option to invest in the third regime. Hence, in order to limit the number of moving parts in this model, we have decided to keepηfixed across regimes.

Proposition 2: Under a HARA utility function, the optimal investment threshold and optimal capacity in Regime 3 are

Θ(3)τ1 =

β23−γ β23

1

γ rb

1−ηQ(3) (13) Q(3) =1

η γ

γ+β13. (14)

Given that investment decisions are often based on the NPV criterion, it is interesting to compare the expression of the optimal capacity in (14) with that of a now-or-never investment opportunity in (11). Note that parameter b is absent in (14), which implies that the firm uses the additional degree of freedom in investment timing to account for more expensive projects.

Furthermore, the impact ofη is cut in half, when the firm has discretion over timing. Intuitively, the firm can mitigate the impact of greater demand sensitivity by adjusting the investment timing. Also, the second-order sufficiency condition (SOSC) requires the objective function to be concave at Θ(3)τ1 , which is shown in Proposition 3.

Proposition 3: The objective functionF1(3)(·)is strictly con- cave atΘ(3)τ1 iffγ < β13.

In Proposition 4, we show that higher risk aversion decreases the propensity to invest in greater capacity. Intuitively, risk aversion decreases the expected utility of the project, which makes a smaller capacity optimal. Hence, measures to reduce the overall risk are crucial to induce investments in RE capacity.

For example, adequate financial markets to hedge price risk can limit the effect of risk aversion [29].

Proposition 4: Greater risk aversion lowers the optimal ca- pacity and decreases the required investment threshold.

In Proposition 5, we show that greater demand uncertainty increases both the optimal capacity and the required investment threshold. Intuitively, the firm mitigates demand uncertainty by deferring the irreversible investment decision in order to learn more about future market conditions.

Proposition 5: Greater demand uncertainty raises the optimal capacity and increases the required investment threshold.

B. Regime 2

Here, we assume that the firm is active in Regime 2 and that it holds an embedded option to abandon it in order to invest in Regime 3. Note that when the firm decides to abandon the second regime, it salvages the operating cost, incurs the abandonment cost, and foregoes the revenues of the active project. Also, since the project is already active in Regime 2, the capacity may have already been set optimally either in Regime 1 or Regime 2, depending on whether an innovation occurred before the firm could invest or after. Assuming that the capacity was fixed upon investment in Regime 1 and cannot be adjusted ex-post, the expected utility of an abandoned project is described in (15) and consists of the expected utility of abandoning the second regime (first two terms) and the embedded option to invest in the third one

Φ(2)0 Θ(2)τ

0, Q(1) =1

ρU

cQ(1)−rE

− A(2)U

Θ(2)τ0

1−ηQ(1)

Q(1)

+F1(3)

Θ(2)τ0 . (15) Following the same steps as in Section IV-A, the maximized value of the option to abandon the second regime is described in (16) forΘ>Θ(2)τ0, as a product of the stochastic discount factor and the expected NPV at abandonment. Note that, in the presence of the embedded option to invest in Regime 3, the optimal abandonment threshold must be obtained numerically

F0(2)

Θ, Q(1)

= max

Θ(2)τ0<Θ(2)τ1

Θ Θ(2)τ0

β22 Φ(2)0

Θ(2)τ

0 , Q(1)

. (16) Next, we step back and assume that the firm is active in the second regime and holds the option to abandon it following a sufficient decrease in demand. The expected utility of the active project in Regime 2 is described as

Φ(2)1 Θ(2)τ

1, Q(1)

=A(2)U

Θ(2)τ1

1−ηQ(1)

Q(1)

1 ρU

cQ(1)+rI(1)

+F0(2)

Θ(2)τ

1, Q(1)

. (17) To emphasize the value of the option to invest in the third regime, we also determine the value of the option to abandon the second one permanently, which is indicated in (18) and we use overbar to differentiate this case. This implies that we are calculating the scenario without Regime 3, meaning that the impact ofF1(3)(2)τ0 )cancels in the following equation:

F(2)0

Θ, Q(1)

= max

Θ(2)τ

0<Θ(2)τ1

Θ Θ(2)τ

0

β22 Φ(2)0

Θ(2)τ0, Q(1)

−F1(3)

Θ(2)τ0 . (18)

(7)

In the absence of the option to invest in Regime 3, we can obtain an analytical expression for the optimal abandonment threshold.

An increase in the demand parametersηraises the optimal aban- donment threshold. Intuitively, this occurs because an increase in ηmakes the inverse demand function more responsive to changes in capacity. Thus, greaterηlowers the output price for a given capacity and, in turn, reduces the attractiveness of the second regime, thereby inducing earlier abandonment. This reveals an important testable hypotheses, since a greaterηimplies a smaller overall market, in which firms might be expected to abandon and transit to RE earlier if the market for fossil fuels continuous to diminish

Θ(2)τ0 =

β12−γ β12

γ1

cQ(1)−rE 1−ηQ(1)

Q(1). (19) For completeness, we also consider the case where a tech- nological innovation occurs before the firm enters the market;

however, due to lower costs associated with the old market, the firm considers to invest in Regime 2. The first-order condition for optimal capacity choice in Regime 2 is

∂Q(2)Φ(2)1 Θ, Q(2)

= 0⇒γA(2)U(Θ)

1−ηQ(2)

Q(2) γ−1

12ηQ(2)

−γ ρU

c+rb(2)

Q(2)γ−1+

∂Q(2)F0(2), Q(2)) = 0. (20) With the option to delay investment, the maximized value of the option to invest in Regime 2 is described in (21) forΘ<Θ(2)τ1 . Unlike Regime 3, the optimal investment threshold is now ob- tained numerically by applying the FONC to the unconstrained optimization problem (21) together with the optimal capacity condition from (20)

F1(2)(Θ) = max

Θ(2)τ1

Θ Θ(2)τ1

β21 Φ(2)1

Θ(2)τ1 , Q(2)

=A(2)1 Θβ21, whereA(2)1 = 1

Θ(2)τ1 β21

Φ(2)1

Θ(2)τ1, Q(2)

. (21) The required investment threshold balances two opposing forces. On the one hand, greater demand uncertainty increases the incentive to wait and to invest later, whereas, on the other hand, the value of the option to abandon also increases, which, in turn, increases the project value and incentivizes early invest- ment.

C. Regime 1

To facilitate the analysis of technological uncertainty, we derive the value functions and optimal investment thresholds in Regime 1 as the solution to a free-boundary problem. The expected utility of the active project in the first regime is indicated in (22) for Θ>Θ(2)τ0 . The first and second terms on the right-hand side are the utility of the immediate profits and the second term is the expected utility in the continuation region. As the second term indicates, within an infinitesimal time intervaldt, a regime switch may take place with probability νdtand the firm will receive the value functionΦ(2)1, Q(1)), which is already defined in (17) and consists of the value of the active project in Regime 2 and a single embedded option to abandon it. In contrast, no innovation will occur with probability 1−νdt, and the firm will continue to hold the value function maxQ(1)Φ(1)1 (Θ)

Φ(1)1 (Θ) =U Θ

1−ηQ(1)

Q(1)

dt−U

cQ(1)+rI(1) +e−ρdt

νdtEΘ

Φ(2)1

Θ +dΘ, Q(1) + (1−νdt)EΘ

Φ(1)1 (Θ +dΘ)

,Θ>Θ(2)τ0. (22) If Θ<Θ(2)τ0, then, upon switching to the second regime, the firm will terminate operations, thus receiving the cash flows following the termination of operations in Regime 2 as well as the option to invest in the third regime, as indicated in (15)

Φ(1)1 (Θ) =U Θ

1−ηQ(1)

Q(1)

dt−U(cQ(1)+rI(1)) +e−ρdt

νdtEΘ

Φ(2)0

Θ +dΘ, Q(1) + (1−νdt)EΘ

Φ(1)1 (Θ +dΘ)

, ΘΘ(2)τ0. (23) Expanding the right-hand side of (22) and (23) using Ito’s lemma, we obtain the following ordinary differential equation:

whereL= 12σ2Θ2∂Θ22+μΘ∂Θ is the differential operator.

The solution for (24) shown at the bottom of this page, is indicated in (25), as shown at bottom of the next page, where β11andβ21are the roots of12σ12β(β−1) +μ1β−(ρ+ν) = 0 andCik=−ν/[12σ21βik(βik1) +μ1βik(ρ+ν)]. The first two terms in the top part of (25) represent the expected profit from operating in the first regime that might suddenly switch to the second. The third term reflects abandonment option from Regime 2, which is adjusted by the final term in order to account for the likelihood of falling below the investment threshold under technological uncertainty. The first three terms on the bottom part represents the expected utility of the profits from operating in the first regime, while the fourth term is the [L −(ρ+ν)] Φ(1)1 (Θ) +νΦ(2)1

Θ, Q(1) +U

Θ

1−ηQ(1) Q(1)

−U

cQ(1)+rI(1)

= 0 [L −(ρ+ν)] Φ(1)1 (Θ) +νΦ(2)0

Θ, Q(1) +U

Θ

1−ηQ(1) Q(1)

−U

cQ(1)+rI(1)

= 0 (24)

(8)

expected utility of the cash flows from abandoning Regime 2, adjusted for technological uncertainty. The fourth term is the option to invest in Regime 3, adjusted via the fifth term because the second regime has yet to become available. Ifν= 0, then the third, fourth, and fifth terms in the upper branch are zero.

Intuitively, ν= 0 implies that no regime switching will take place, and as a result, the first technology will continue to operate in the first regime. In contrast,limν→∞Φ(1)1, Q(1)) = Φ(2)1, Q(2))sincelimν→∞νA(1)= 1andlimν→∞A(1) = 0 The condition for optimal capacity choice at investment in Regime 1 is described as follows:

γ

1 +νA(2)

A(1)U(Θ)

1−ηQ(1)

Q(1) γ−1

×

12ηQ(1) −γ

ρU

c+rb(1)

Q(1)γ−1 +

∂Q(1)

C22F0(2), Q(1)) +A(1)1 Θβ21

= 0 (26)

Note that if the firm invests in the first regime, then it needs to consider not only how to maximize the profit in the first regime, but also take into consideration the implications of the installed capacity in a potentially declining market (Regime 2).

Intuitively, we expect to see that the firm installs a smaller project to limit its risk exposure when a technological innovation in likely to arrive.

Next, the dynamics of the option to invest in the first regime are described as follows:

F1(1)(Θ) =e−ρdt

νdtEΘ

F1(2)(Θ +dΘ) + (1−νdt)E

F1(1)(Θ +dΘ)

. (27) The first term on the right-hand side of (27) indicates that, while waiting to invest in the first regime, an innovation may take place with probabilityνdtand the firm will receive the value function F1(2)(Θ). In contrast, with probability1−νdtno innovation will take place, and the firm will continue to hold the value function F1(1)(Θ).

By expanding the right-hand side of (27) using Itˆo’s lemma we obtain (28), which must be solved together with (29), i.e., the differential equation for the value of the option to abandon in the second regime

[L −(ρ+ν)]F1(1)(Θ) +νF1(2)(Θ) = 0 (28) [L −ρ]F1(2)(Θ) = 0. (29)

Hence, the value of the option to invest in Regime 1 is obtained by solving (28) and (29) and is described as follows:

F1(1)(Θ) =

D1(1)Θβ11+C12A(2)1 Θβ12, Θ<Θ(1)τ1 Φ(1)1 (Θ), ΘΘ(1)τ1 . (30) Next, A(1)1 , B1(1), D(1)1 , Q(1), Θ(1)τ1 , and Θ(2)τ0 are obtained numerically via value-matching and smooth-pasting conditions between the two branches of (25), (26), and (30).

V. NUMERICALEXAMPLES

A. Regime 3

For the numerical examples, we assume that η= 0.05, b1 =b2 = 75, b3 = 100, r=ρ= 10%, σk = 0.25, γ∈ [0.9,1.1], μ1= 0%, μ2=2%, μ3= 2%, ν= 0.1,Θ = 30, E= 10, andc= 1. Also, we assume that a new regime (tech- nology) is more attractive in that it exhibits a higher growth rate compared to the incumbent one, yet entry entails a greater capital expenditure. In terms of context, a firm may have an oil platform that can be retrofitted to an offshore wind farm. This example fits within the general setting, where a firm develops a facility using an existing technology holding an embedded option to switch to a new one following a market regime switch that renders the latter more profitable. The irreversibility of the initial investment decision is reflected on both the associated sunk investment cost and the decommissioning cost that the firm must incur.

The left panel in Fig. 3 illustrates the option and project value as well as the maximized NPV for μ3= 1%,2%, while the right panel illustrates the impact ofγonΘ(3)τ1 forγ <1 (risk aversion),γ= 1(risk-neutrality) andγ >1(risk-seeking). Note that an increase inμ3raises the attractiveness of Regime 3 and, in turn, the incentive to install a bigger project, also decreasing the required investment threshold. As the right panel illustrates, greater risk-aversion accelerates investment by increasing the firm’s incentive to build a smaller project, and, thus, reduce exposure to downside risk, as shown in Proposition 4. This is in direct contrast to [8] and happens because a more risk- averse firm chooses a lower capacity instead of postponing the investment decision to reduce the overall risk exposure. Also, higher demand uncertainty postpones investment by raising the associated opportunity cost and, in turn, the value of waiting.

Note that the association between the time of investment and the optimal price threshold is based on the property of the GBM with positive drift that indicates that the output price is expected to increase on average with time. Thus, when an investment is delayed or accelerated, the associated output price is on average higher or lower, respectively.

Φ(1)1 (Θ) =

⎧⎪

⎪⎪

⎪⎨

⎪⎪

⎪⎪

1 +νA(2)

A(1)U Θ

1−ηQ(1) Q(1)

1ρU

cQ(1)+rI(1) +C22F0(2), Q(1)) +A(1)1 Θβ21, Θ>Θ(2)τ0 1−νA(2)

A(1)U Θ

1−ηQ(1) Q(1)

ρ+1νU

cQ(1)+rI(1) +νU(cQ(1)−rE)

ρ(ν+ρ) +C13F1(3)(Θ) +B1(1)Θβ11, ΘΘ(2)τ0

. (25)

(9)

Fig. 3. Impact ofμ3on option and project value whereγ= 1(left panel) and optimal investment threshold versusγ(right panel).

Fig. 4. Optimal capacity versusγforη= 0.05(left panel) and versusη(right panel).

In line with Fig. 3, the left panel of Fig. 4 indicates that it is op- timal to invest in a smaller capacity when risk aversion increases, while greater demand uncertainty raises the incentive to wait and invest later in a bigger project. However, as the right panel illustrates, greater η increases the price sensitivity to project scale and leads to the installation of a smaller project, thereby making the impact of greater risk aversion more pronounced.

This implies that both risk aversion and price sensitivity to project scale present significant forces that can deter a bold entry to a new market and emphasizes how managerial decisions are subject to both internal, e.g., attitudes toward risk, and external pressures reflected in the wider economic environment.

B. Regime 2

In Regime 2, a technological innovation has already altered the market, which means that the market outlook for the first

technology is deteriorating. The left panel in Fig. 5 illustrates the impact ofηandσ2on the optimal abandonment threshold.

Note that a lower η implies that prices are less affected by additional capacity, which, in turn, leads to the installation of a bigger project. However, an increase in the amount of installed capacity raises the exposure to downside risk and, in turn, the incentive to abandon the project at a higher threshold. Further- more, greater demand uncertainty in Regime 2 increases the incentive to postpone the abandonment decision. Intuitively, this happens because the firm would be reluctant to abandon Regime 2 permanently due to a temporary downturn, which is more likely when uncertainty is high. However, as the right panel indicates, an increase in demand uncertainty in Regime 3 presents and opposing force, as it raises the value of the associated investment option and, in turn, the option to abandon Regime 2. However, this is irrelevant if the option to invest in Regime 3 is not present, as illustrated by the permanent abandonment threshold.

(10)

Fig. 5. Optimal abandonment threshold versusγ(left panel) andσ3(right panel).

Fig. 6. Impact ofνandγon optimal investment threshold (left panel) and optimal capacity (right panel) in Regime 1.

C. Regime 1

Fig. 6 illustrates the impact ofνandγon the optimal invest- ment threshold (left panel) and the optimal capacity (right panel) in Regimes 1 and 2. As the left panel indicates, greater likelihood of regime switching raises a firm’s incentive to postpone invest- ment in the first regime. Interestingly, although a nonmonotonic impact is reported in earlier literature [9], this is not particularly evident here, especially for high levels of risk aversion. Interest- ingly, greater likelihood of regime switching does not raise the amount of installed capacity, even though it raises the optimal investment threshold, but, instead, results in the installation of a smaller project. This seemingly counterintuitive result happens because the emergence of a new market regime reduces the attractiveness of the existing one, thereby raising the incentive to invest later in a smaller project in Regime 1. Intuitively, the firm would not want to commit to a project of large capacity that is based on a technology that will soon become obsolete.

In order to establish further the intuition underlying this result,

notice also how both the optimal investment threshold and the optimal capacity in Regime 1 converge under greaterνto their values in Regime 2, where a regime switch has already taken place.

Fig. 7 illustrates the impact ofν andσ1on the relative loss in option value due to fixed capacity, which is indicated as

F1(1)

Θ(1)τ1, Q(1)

−F1(1)

Θ(1)τ1 , Q F1(1)

Θ(1)τ1 , Q(1)

. (31)

The left panel in Fig. 7 indicates that, as capacity increases, the relative loss in option value diminishes when Q < Q(1), becomes zero forQ=Q(1), and increases ifQ > Q(1). This implies that increasing demand uncertainty raises (lowers) the relative loss in option value when the amount of installed ca- pacity is lower (greater) than the optimal one. By contrast, the right panel indicates that greater likelihood of innovation lowers the amount of installed capacity and reduces (increases) the

Referanser

RELATERTE DOKUMENTER

Larger water electrolysis plants, intending to exploit electricity price fluctuations, need to save the amount equal to the investment costs of excess production capacity and

We show that greater likelihood of subsidy retraction (provision) lowers (raises) the incentive to invest, and, by comparing a stepwise to a lumpy investment strategy, we show how

Thus, we determine not only the optimal investment threshold and the corresponding optimal capacity under lumpy and stepwise investment, but also the impact of price uncertainty on

Greater likelihood of subsidy retraction (provision) lowers (raises) the expected value of the project and decreases (increases) the investment incentive.. Similarly, Figure

We confirm that, if the capacity of a project is fixed and the investment premium associated with stepwise investment is positive, then lumpy investment becomes more valuable than

Tenure security, resource poverty, risk aversion, public programs and household plot level conservation investment in the highlands of northern Ethiopia?. Promotion of medium

We examine the optimal investment behavior of a firm that has the option to invest in a project against a fixed sunk cost, and consider a situation in which the underlying variable

Finally, while the risky investment game has been found to give larger gender differences in risk tolerance than some other experimental approaches used to elicit risk preferences,