• No results found

Extensions of an integrated approach for multi-resource shop scheduling

N/A
N/A
Protected

Academic year: 2022

Share "Extensions of an integrated approach for multi-resource shop scheduling"

Copied!
14
0
0

Laster.... (Se fulltekst nå)

Fulltekst

Referanser

RELATERTE DOKUMENTER

“Designing Group Layout of Unequal-Area Facilities in a Dynamic Cellular Manufacturing System with Variability in Number and Shape of Cells.” International Journal of Production

production is essentially discrete, the defective items are stored in a buffer of a limited capacity, a lower bound on the storage time is given, there are product dependent

Compared to an automated guided ve- hicle (AGV) system in which a central unit takes control of scheduling, routing, and dispatching decisions for all AGVs, AMRs can communicate

Therefore, this paper develops a multi-agent architecture and a web-based agent appointment scheduling system to support students and lecturers in managing appointment scheduling

We have provided a concise formal definition of a Complex Job-Shop scheduling problem which generalizes several scheduling problems defined in the literature: It reduces to

In this paper, we proposed a general local search approach to determine Pareto fronts for the Multi-Objective Flexible Job- shop Scheduling Problem (MOFJSP) for any combination

A Multi-Lot Approach based on List Scheduling Let us now introduce the procedure to determine the maximum number of wafer lots, which can be introduced in a given TCT

Reactive opportunity exploitation is modelled as variations within each game strategy, and the concept endogenous opportunities is introduced to account for the effect of