• No results found

Proposition for new Railway line between Ranheim and Midtsanden

N/A
N/A
Protected

Academic year: 2022

Share "Proposition for new Railway line between Ranheim and Midtsanden "

Copied!
41
0
0

Laster.... (Se fulltekst nå)

Fulltekst

(1)

06-2011

Authors

Jørn Fosen Simonsen Eivind Pagander Tysnes

Proposition for new Railway line between Ranheim and Midtsanden

Forslag til ny jernbanetrasé mellom Ranheim og Midtsanden

HØGSKOLEN I SØR- TRØNDELAG

AVDELING FOR TEKNOLOGI Studieprogram bygg og miljø

BLUEPRINT BOOKLET TEGNINGSHEFTE

Photo: Svein E. Sando, 04.08.2006

(2)

BLUEPRINT LIST

Proposition for new Railway line between Ranheim and Midtsanden

Forslag til ny jernbanetrasé mellom Ranheim og Midtsanden

Blueprint no. Blueprint Title Scale Date Drawn by Revision / Date

001 002 003 Last Rev

B0 Main overview 1:30000 13.05.11 Eivind Pagander Tysnes 000

B1 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B2 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B3 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B4 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B5 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B6 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

B7 Overview alt 1 and 2 1:5000 13.05.11 Eivind Pagander Tysnes 000

C1 Plan and Profil alt 1, Pr. 7780 – Pr. 8530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C2 Plan and Profil alt 1, Pr. 8530 – Pr. 9280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C3 Plan and Profil alt 1, Pr. 9280 – Pr. 10030 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C4 Plan and Profil alt 1, Pr. 10030 – Pr. 10780 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C5 Plan and Profil alt 1, Pr. 10780 – Pr. 11530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C6 Plan and Profil alt 1, Pr. 11530 – Pr. 12280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C7 Plan and Profil alt 1, Pr. 12280 – Pr. 13030 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

(3)

BLUEPRINT LIST

Proposition for new Railway line between Ranheim and Midtsanden

Forslag til ny jernbanetrasé mellom Ranheim og Midtsanden

Blueprint no. Blueprint Title Scale Date Drawn by Revision / Date

001 002 003 Last Rev

C8 Plan and Profil alt 1, Pr. 13030 – Pr. 13780 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C9 Plan and Profil alt 1, Pr. 13780 – Pr. 14530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C10 Plan and Profil alt 1, Pr. 14530 – Pr. 15280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C11 Plan and Profil alt 1, Pr. 15280 – Pr. 16030 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C12 Plan and Profil alt 1, Pr. 16030 – Pr. 16780 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C13 Plan and Profil alt 1, Pr. 16780 – Pr. 17530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C14 Plan and Profil alt 1, Pr. 17530 – Pr. 17990 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C15 Plan and Profil alt 2, Pr. 7780 – Pr. 8530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C16 Plan and Profil alt 2, Pr. 8530 – Pr. 9280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

C17 Plan and Profil alt 1, Pr. 9280 – Pr. 10030 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C18 Plan and Profil alt 1, Pr. 10030 – Pr. 10780 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C19 Plan and Profil alt 1, Pr. 10780 – Pr. 11530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C20 Plan and Profil alt 1, Pr. 11530 – Pr. 12280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C21 Plan and Profil alt 1, Pr. 12280 – Pr. 13030 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C22 Plan and Profil alt 1, Pr. 13030 – Pr. 13780 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

(4)

BLUEPRINT LIST

Proposition for new Railway line between Ranheim and Midtsanden

Forslag til ny jernbanetrasé mellom Ranheim og Midtsanden

Blueprint no. Blueprint Title Scale Date Drawn by Revision / Date

001 002 003 Last Rev

C23 Plan and Profil alt 1, Pr. 13780 – Pr. 14530 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C24 Plan and Profil alt 1, Pr. 14530 – Pr. 15280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C25 Plan and Profil alt 1, Pr. 14530 – Pr. 15280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C26 Plan and Profil alt 1, Pr. 14530 – Pr. 15280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000 C27 Plan and Profil alt 1, Pr. 14530 – Pr. 15280 1:1000/1:200 13.05.11 Eivind Pagander Tysnes 000

F1 Standard Section: Rock, Landfill and Cutting 1:100 11.05.11 Eivind Pagander Tysnes 000

F2 Standard Section: Tunnel 1:100 06.05.11 Eivind Pagander Tysnes 000

(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)

• •• • • • •• ••• • •• •• •• •

R= 15500.000 St=9364.928 Z= 10.370

Lavbrekk

• •• • • • •• ••• • •• •• •• •

R= 15500.000 St=9364.928 Z= 10.370

Lavbrekk

(16)

• • • •••••• • • • •••••Z= 13.893 •••••••••

St=10348.006

• • • •••••• • • • •••••Z= 13.893 •••••••••

St=10348.006

(17)

•• •• • • •

• • • •

•• •• • • • • • • •

R= 15500.000 St=11392.791 Z= 5.546 Lavbrekk

Laveste punkt Z= 5.546 St=11461.756

•• •• • • •

• • • •

•• •• • • • • • • •

R= 15500.000 St=11392.791 Z= 5.546 Lavbrekk

Laveste punkt Z= 5.546 St=11461.756

(18)
(19)

•• •• • • • • •• ••• •• • •• • • •

R= 15500.000 St=12414.847 Z= 5.546 Lavbrekk Laveste punkt

Z= 5.546 St=12366.413

•• •• • • • • •• ••• •• • •• • • •

R= 15500.000 St=12414.847 Z= 5.546 Lavbrekk Laveste punkt

Z= 5.546 St=12366.413

(20)

• • • •••••• • • • ••••••••••••••

Z= 10.024 St=13206.397

Laveste punktZ= 8.122 St=13675.006

• • • •••••• • • • ••••••••••••••

Z= 10.024 St=13206.397

Laveste punktZ= 8.122 St=13675.006

(21)

Laveste punkt Z= 8.122 St=14235.852 Laveste punkt Z= 8.122 St=14235.852

(22)
(23)

• •• •• •• • • •

•• •••• •• •

• • R= 24000.000

St=15637.785 Z= 17.588

• • • • ••• • • • • • • • • •

• • • •••••• • • • ••••••••••••••

Z= 17.308 St=15682.242

• •• •• •• • • •

•• •••• •• •

• • R= 24000.000

St=15637.785 Z= 17.588

• • • • ••• • • • • • • • • •

• • • •••••• • • • ••••••••••••••

Z= 17.308 St=15682.242

(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)

3% 3%

1300 400 875 925 1300

1300 4001300

875 925 1000 500

3500 4400

3500 3000

11400

7501000

1000

Mastefundament Kabelkanal

Referansehøyde

Formasjonsplan Mastefundament

Kabelkanal Ved fjellskjæring

Min.

(fanggrøft)

Alle mål i millimeter

(41)

255016254325 8500 R5950

R5950

2550

5950 5950

11900 2250 2250

Tunnel

Spor

Teoretisk sprengningsprofil Spor

Normalprofil

Drenering Formasjonsplan

Drenering

5% 5% Tunnelmål

Normaltverrsnitt Spregningstverrsnitt

Periferilengde (heng + vegger) (Spregningsprofil)

Dobbeltspor 90,5 118,5 28,5 Enhet

m

Alle mål i millimeter

Referanser

RELATERTE DOKUMENTER

Based on the need for new management competence due to market transformations and organisational changes between 1936 and 2009, we suggest the following proposition

The town developed slowly until World War II. In 1944, a new national road was built and a new railway line was added in a loop towards the town. New buildings grew up on

Equally important, the report identifies and analyses the data requirements of the services in the execution environment, both the necessary input data describing available assets

Keywords: interoperability; interoperability profile; IOP; unmanned ground system; UGS; unmanned ground vehicle; UGV; command and control systems; Joint Architecture for

By exploring the risky joking relationships that emerge in the context of a gender-mixed total institution, this article aims to gain a better understanding of a paradox

For at Telenor skal være unike også i Norge, forklarer hun at de ønsker å fokusere på hvilken innvirkning ansatte kan ha i Telenor, gjennom å bidra til å bygge en digital fremtid

The main objective of the present master thesis is to provide insights and recommendations for the cost estimation process (P50) of the new Helltunnel in the Ranheim - Værnes

The system is based on a wireless microseismic sensor network, and uses a combination of geophones and magnetometers to identify vibrations in the railway line, generated upon