1. Introduction:
This project aims to transform the Grønmo area with large existing rubbish collection zones into a rec- reational park. At the same time, the current rubbish functions, material recycling, material composting and material sorting will be kept and be converted sustainable within the idea of the public park. The whole Grønmo area is around 42.5 hector. This transformation will reaffirm the qualities of river, forest, field site with the concept to infill new experiences into the area. There could be new activities in this area, including recycling learning classroom, birds watching, hiking, campfire festival, bicycle group gathering, picnic, Christmas tree market etc. This transformation project includes new organisation system of material collection, 2nd hand market, new organisation system of material sorting, new organisation of material composting, visitor centre, new system of contaminated water filtering. To be able to connect the area to the existing morphology and natural environment of South eastern of Oslo, this project is part of the effort to turn the contaminated areas around Oslo into a new landscape scen- ery. The task of the thesis is on the crossing section of landscape design, architecture infrastructure design and architecture design.
2. History
Grønmo is located in the south eastern part of Oslo in the district of Søndre Nordstrand approximately 12km southeast of the Oslo Centre. The size of the project site is around 42.5 hector, approximately to 1.5 times size of the Frogner Park. This area is close to Sørliveien on the west and Grønmo golf course on the north. On the south, east and partly north, this area is surrounded by Østmarka as an important gateway to the forest. It is close to the E6 highway. Many hiking trails start from here. It serves as good meeting places outside in the area between the noisy city life and the quiet forest.
Grønmo was entirely covered by forest in the past. But now it is a large rubbish collection and treat- ment area. The Grønmo landfilled used to be the largest one in Northern Europe. Having functioned as Oslo’s main spot for the unwanted since 1969, Grønmo counted over 8 million cubic meters of trash.
It was closed in 2009. Today the waste is covered by a thin piece of soil top cover with green dressed.
Right now, after the closure of the landfilled place, there are a recycling station, a sorting area and a composting plant on site.
West Marka
East Marka North Marka
Lillo Marka
Gjelleråsen
OSLO
Romeriksåsen
Hook Woods
Bærums Marka
Kjekstad Marka
South Marka
7.5 km
5 km
2.5 km Bogerud Lambertseter
Bergkrystallen
Ljabru
Mortensrud
Skullerud Sæter
Nordstrand
Ljan
Hauketo
Klemetsrud Holmlia
Prinsdal Hvervenbukta
Train route European route Secondary route T-bane route Tram route Station Hiking trail
Rosenholm
E18 NSB E6
Gjersrud Stensrud Grønmo RV 155
Smestad Recycling center
Colosseum mini Recycling station
Marienlyst mobile mini Recycling station
Uranienborg kirke mobile mini Recycling station Vestkanttorvet mobile mini Recycling station
Bentsehjømet mini Recycling station
Løren mini Recycling station
Romsås mini Recycling station
Fredensborg mini Recycling station
Bygdøy garden waste reception
Bygdøy mobile mini Recycling station
Fredensborg Recycling center
Pilestredet park mini Recycling station Sofienbergparken mini Recycling station Grefsen mini Recycling station
Kampen mini Recycling station Helsfyr mini Recycling station Kampen mini Recycling station
Etterstad mobile mini Recycling station Galgeberg mobile mini Recycling station
Tøyen mobile mini Recycling station
Tjuvholmen mobile mini Recycling station Grønland mobile mini Recycling station
Gamlebyen mobile mini Recycling stationKværnerbyen mobile mini Recycling station Vålerenga mobile mini Recycling station
Haraldrud Recycling center
Lindeberglokalet Recycling center
Grønmo Recycling center Klemetsrudanlegget AS
Returpunkt Sanitation Department
Haraldrud Sanitation Department
Main recycling center Sanitation Department mini Recycling station mobile mini Recycling station
3. Intention
On the level of architecture and on the level of landscape, Grønmo will be constructed as a new meet- ing area between the natural environment and the man-made artificial landscape. Grønmo will be given new identity through good coexistence between recreation, learning and municipal engineering facili- ties and recycle material treatment.
4. Program
A. Visitor center, ca. 600 m2
Restaurant and Cafe Small auditorium Small exhibition space Office
B. 2nd hand flea market, ca. 1000 m2
Outside space: temporary market space Inside space: market shops
offices
meeting rooms storage
equipment rooms
C. Material recycling area, ca. 9250 m2
Outside space: roof
Inside space: material collection containers area administration office
storage
equipment rooms
D. Composting area, ca. 21400 m2
Operational equipment space Curing and compost storage Raw material storage
Composting pad
E. Material sorting and treatment area, ca. 7000 m2
Material sorting and treatment area Operational office
F. Landscape areas
Public area: parking area scenery platform gathering space skating plate landfilled park
Infrastructural landscape: warm water pond oxidation pond enhancement pond leachate water pond clean water pond wetland area
5. Site
1
2 3
5 4 76 98 1110 1312 1514 1716
18 19202122
2324 25
2627 28
29 30
31
32 33
01 Administration office 02 Storage room for old tires 03 Storage
04 Reception room 05 Collection container for plaster 06 Collection container for mattresses 07 Collection container for wood
08 Collection container for cardboard and paper 09 Collection container for incinerated 10 Collection container for metal 11 Collection container for wood 12 Collection container for plastic 13 Collection container for things to landfill 14 Collection container for wood 15 Collection container for cardboard and paper 16 Collection container for incinerated 17 Collection container for impregnated wood 18 Dangerous waste
19 Electronics
Site boundary Composting Landfilled Water pond 20 Reuse
21 Reuse 22 Reuse
23 Collection area for asbestos 24 Collection area for PCB windows
(Norwegian-produced insulating glass windows produced 1965-1975) (imported insulated glass windows produced until 1980, only from private customers) 25 Collection area for chloropherafine routes insulated glass windows (produced 1975-1990) 26 Collection area for garden waste grass, leaves, small twigs and diameter max 20cm branches 27 Collection area for roots, stumps and stems over 15 cm in diameter
28 Collection area for unused tiles, toilets and washbasins 29 Collection area for clean asphalt (bags must be emptied) 30 Collection area for brick concrete, light concrete
(shall not contain cables, plastic, paper and tiles, etc) (bags must be emptied) 31 Collection area for clean soil (bags must be emptied)
32 Sorting area storage room 33 Sorting area storage room 2 34 Composting management office 1 35 Composting management office 2
34
35
50
0 20 100 200 m
6. Delivery
Situation plan: 1:2000
Plans and sections: 1:1000
Detailed plans and sections: 1:500 / 200
Situation model: 1:3000
Landscape model: 1:1000
Detailed models: 1:500 / 200
Diagrams
Book
7. Research
Research about composting process and organization Research about the landfilled
composting pad (pad slope graded to 2-4%) diversion channel and dike
dike
holding pond or infiltration area pad runoff collec- tion channel
sedi- ment trap raw material
storage curing and com- post storage diversion
channel and dike diverted
runoff sorting grinding or
shredding
mixing primary
material amendments
repetitive operation
raw material storage
windrow or pile formation
curing
screening or shredding
compost
storage end use
bagging and shipping
oversized materials from screen active composting
aeration, turning, monitoring, ordoe control, and so on diverted
runoff diverted
runoff
composting pad (pad slope graded to 2-4%) diversion channel and dike
dike
holding pond or infiltration area pad
runoff collec- tion channel
sedi- ment trap raw material
storage
curing and com- post storage diversion
channel and dike diverted
runoff sorting grinding or
shredding
mixing primary
material amendments
repetitive operation
raw material storage
windrow or pile formation
curing
screening or shredding
compost
storage end use
bagging and shipping
oversized materials from screen active composting
aeration, turning, monitoring, ordoe control, and so on diverted
runoff diverted
runoff
WASTE
TOP COVER
GAS EMISSION
GAS STATION
GAS PUMP
HIGH POWER EL LINE RAIN WATER
VERTICAL GAS WELL
HORIZONTAL GAS WELL
GROUND WATER WELL TRANSPIRATION
EVAPORATION
LEACHATE WATER
LEACHATE WATER PIPE INFILTRATION OF SEWAGE INTO GROUNDWATER
PRE TREATMENT PURIFICATION OSLO FJORD +
DRAIN STROKE STREAM WATER
STREAM WATER INTERCEPTING
GROUND WATER GROUND WATER
Planting soil Barrier protection
material Well head Lateral pipe
Suction delivers gas to the purification plant
Landfill cap
Gas vent layer
Impermeable plastic liner Drainage layer Intermediate
soil cover Trash
Picture source: New Yourk City Sanitation Department Perforated end cap
Landfill gas End
cap
Research about the water system on site Research about the wind on site
9/18/17, 1:57 PM Wind & weather statistics Oslo/Solveien - Windfinder
Page 1 of 2 https://www.windfinder.com/windstatistics/oslo_solveien
Report from local weather station at
13:50 local time. SUNRISE6:50 SUNSET19:30 LOCAL TIME13:56 (UTC +2) ELEVATION100 m BACK TO MAPS (/#9/59.8567/10.7897)
Wind & weather statistics
Oslo/Solveien 5 kts
South-Southwest
18° C
No severe weather warnings activeForecast(/forecast/oslo_solveien)Superforecast(/weatherforecast/oslo_solveien)Report(/report/oslo_solveien)Wind
statistics(/windstatistics/oslo_solveien) Tides(/tide/oslo_solveien)Webcams(/webcams/oslo_solveien)
fra 1035 kr fra 1035 kr 1870 kr
Radisson Blu Plaza
45%
trivago.no
Month of year
Dominant wind direction (/wind/windspeed.htm) Wind probability >= 4 Beaufort (%)
Average Wind speed (/wind/windspeed.htm) (kts) Average air temp. (°C)
Jan 01
-2 Feb
02
1 Mar
03
5 Apr
04
10 May
05
15 Jun
06
19 Jul 07
22 Aug
08
19 Sep
09
16 Oct
10
9 Nov
11
4 Dec
12
0 Year 1-12
10 1
3 1
2 3 4
4
4 5 5
4
4 2 4
1
3 2
3 2 4
1
3 1
3 2 3
Wind direction distribution in (%%)
Year
January February March April MayJune JulyAugust September October November December Year
N NNE
NE ENE
E
ESE
SE S SSE
SSW SW WSW
W WNW
NW NNW
0 2 4 6 8 10 12 14
© windfinder.com
Radiss…
Radiss…
WIND STATISTICS
Statistics based on observations taken between 05/2012 - 08/2017 daily from 7am to 7pm local time. You can order the raw wind and weather data in Excel format from our historical weather data request page (/contact/weatherdata.htm).
(https://www.facebook.com/dialog/share?
app_id=162630957105069&display=page&href=https://www.windfinder.com/windstatistics/oslo_solveien%3Futm_source=facebook%26utm_medium=web%26utm_campaign=fb- share&redirect_uri=https://www.windfinder.com/windstatistics/oslo_solveien%3Futm_source=facebook%26utm_medium=web%26utm_campaign=fb-
share)
(https://twitter.com/share?
url=)
Find weather station
(/) (
/help#statistics )
(/settings)
Picture source: http://innsyn.pbe.oslo.kommune.no/saksinnsyn/casedet.asp?direct=Y&mode=&caseno=200804068 Planbeskrivelse
Picture source: http://innsyn.pbe.oslo.kommune.no/saksinnsyn/casedet.asp?direct=Y&mode=&caseno=200804068 Illustrasjon idrettsanlegg Groenmo
Reuse Composting
Recycling
Excursion Parking
New Buildings Open Structures
Picture source: http://innsyn.pbe.oslo.kommune.no/saksinnsyn/casedet.asp?direct=Y&mode=&caseno=200804068 Revidert plankart
Research about the long term plan by the Oslo government
12
Nye tiltak
De følgende sidene skisserer ulike tiltak som kan være aktuelle på Grønmo, og hva som trengs for komme i gang. Hvert tiltak er illustrert og beskrevet. Skissene er ikke utfyllende, men viser mulige løsninger som oppfyller intensjonene for Oslo kommunes arbeid med ny reguleringsplan for området. Det forutsettes at ideene bearbeides videre før de blir realiserte. Det er lagt vekt på å gjøre tiltakene så robuste som mulig slik at endrede behov i fremtiden lett kan tilpasses.
Tiltakene er basert på innspill fra bydelen og aktuelle brukergrupper som har meldt inn ønsker og behov. Det er også foretatt kartleggingsstudier av mulige aktører, samarbeidsmodeller og partnere innen formidling og opplæring. Denne informa- sjonen foreligger i en egen rapport (Loop 2012).
Det er utarbeidet grundige kostnadsvurderinger av hele reguleringsalternativ 3, inkludert delkostnader for hvert enkelt tiltak som er beskrevet her. Se egen rap- port om dette (Holte Consulting, januar 2013).
Det finnes også et kvalitetsprogram, som er vedlegg til reguleringsforslaget.
Kvalitetsprogrammet gir føringer for krav til miljø, kvalitet og design.