• No results found

IP - Initial Period EP - Extension Period

N/A
N/A
Protected

Academic year: 2022

Share "IP - Initial Period EP - Extension Period"

Copied!
20
0
0

Laster.... (Se fulltekst nå)

Fulltekst

(1)

IP - Initial Period Licence round TFO2018

PL Block(s) Companies O

P/

Share(%)Work obligation and decisions

Phase Dura- tion (yrs)

Activity/decision

006 F 2/5 Faroe Petroleum Norge AS O 85

Aker BP ASA P 15

Work obligation as for PL 006 C

019 H 7/12 Aker BP ASA O 80

Faroe Petroleum Norge AS P 20

1 1 G&G studies

Decision: Drill or Drop 2 1 Drill exploration well (the

well can be drilled in PL 019 as long as applied prospect is drilled) Decision: Enter extension period or Drop

IP: 2 EP: PL 019

159 G 6507/2,3 Equinor Energy AS O 85

INEOS E&P Norge AS P 15

Work obligation as for PL 159 B

229 F 7121/9, 7122/5,7,8 Vår Energi AS O 65

Equinor Energy AS P 35

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: PL 229

272 B 30/11,12 Equinor Energy AS O 50

Aker BP ASA P 50

1 3.5 G&G studies

Decision: Drill or Drop

IP: 3.5 EP: PL 272

338 E 16/4 Lundin Norway AS O 50

OMV (Norge) AS P 20

Lime Petroleum AS P 30

Work obligation as for PL 338 C 338 FS 16/1 Applies to all levels

deeper than 100m below base Jurassic.

Lundin Norway AS O 65

OMV (Norge) AS P 20

Wintershall Norge AS P 15

1 2 G&G studies Decision: Enter extension period or Drop

IP: 2 EP: PL 338

(2)

418 B 35/9 Wintershall Norge AS O 35

Capricorn Norge AS P 20

Edison Norge AS P 15

DEA Norge AS P 10

Spirit Energy Norge AS P 20

Work obligation as for PL 418

636 B 36/7 Neptune Energy Norge AS O 30

Idemitsu Petroleum Norge

AS P 30

Wellesley Petroleum AS P 20

Pandion Energy AS P 20

Work obligation as for PL 636

644 C 6506/10 OMV (Norge) AS O 30

Faroe Petroleum Norge AS P 20 Spirit Energy Norge AS P 10

Equinor Energy AS P 40

Work obligation as for PL 644 767 B 7120/3, 7121/1,2,3,

7122/1 Lundin Norway AS O 50

INPEX Norge AS P 40

DNO Norge AS P 10

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Enter extension period or Drop

IP: 4 EP: PL 767

782 SD 25/4,7 Applies to all

stratigraphical levels ConocoPhillips Skandinavia

AS O 40

DEA Norge AS P 20

Aker BP ASA P 20

Equinor Energy AS P 20

1 1 G&G studies

Decision: Drill or Drop 2 3 Drill exploration well (the

well can be drilled in PL 782 S as long as the applied prospect is drilled)

Decision: Enter extension period or Drop

IP: 4 EP: PL 782 S

796 B 6407/2,3,6 Equinor Energy AS O 60

Edison Norge AS P 20

Vår Energi AS P 20

Work obligation as for PL 796

838 B 6507/3 PGNiG Upstream Norway

AS O 40

DEA Norge AS P 30

Aker BP ASA P 30

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

(3)

IP - Initial Period Licence round TFO2018

IP: 7 EP: PL 838

902 B 7120/1,2 Lundin Norway AS O 40

Petoro AS P 20

Aker BP ASA P 30

DNO Norge AS P 10

Work obligation as for PL 902

913 B 24/11,12 OMV (Norge) AS O 50

Repsol Norge AS P 50

Work obligation as for PL 913

937 B 6406/12 INEOS E&P Norge AS O 40

DEA Norge AS P 30

Petrolia NOCO AS P 30

Work obligation as for PL 937 959 B 6404/1,2, 6503/9 Equinor Energy AS O 50

Petoro AS P 20

M Vest Energy AS P 10

Spirit Energy Norge AS P 20

Work obligation as for PL 959

967 3/4,5,7,8 DNO Norge AS O 60

Equinor Energy AS P 40

1 2 Acquire modern broadband 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

968 2/2,5,6,8 Faroe Petroleum Norge AS O 40

Petoro AS P 20

MOL Norge AS P 20

Aker BP ASA P 20

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

(4)

969 1/6,9 Faroe Petroleum Norge AS O 45

A/S Norske Shell P 40

Spirit Energy Norge AS P 15

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

970 1/3 OMV (Norge) AS O 50

Petoro AS P 20

Neptune Energy Norge AS P 30

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

971 8/3,6, 9/1,4 Equinor Energy AS O 70

M Vest Energy AS P 30

1 2 Acquire 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

972 9/1, 17/11,12, 18/10 Repsol Norge AS O 40

M Vest Energy AS P 30

Dyas Norge AS P 30

1 2 Conceptual studies Decision: Continuation (BoV) or Drop

2 1 Prepare development plan Decision: Submit PDO or Drop

IP: 3 EP: 20

(5)

IP - Initial Period Licence round TFO2018

973 15/12 OKEA AS O 30

Petoro AS P 20

Chrysaor Norge AS P 50

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

974 15/12 OKEA AS O 78.57

Chrysaor Norge AS P 21.43

1 2 G&G studies (perform seismic inversion, conceptual studies and prepare PDO)

Decision: Submit PDO or Drop

IP: 2 EP: 15

975 15/8,9,11,12 DNO Norge AS O 60

Source Energy AS P 40

1 2 Acquire 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 15

976 17/4,5,6,7,8,9 Lundin Norway AS O 50

Petoro AS P 20

Repsol Norge AS P 30

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

(6)

977 15/5 Aker BP ASA O 60

Vår Energi AS P 40

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

978 15/5 Aker BP ASA O 60

Vår Energi AS P 40

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

979 15/6, 16/1,4 Aker BP ASA O 60

Equinor Energy AS P 40

1 2 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

980 16/4 Vår Energi AS O 60

Suncor Energy Norge AS P 40

1 2 Acquire 3D seismic over prospective area Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

(7)

IP - Initial Period Licence round TFO2018

981 16/4 Lundin Norway AS O 60

Aker BP ASA P 40

1 1 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 6 EP: 20

982 16/3 Total E&P Norge AS O 60

Aker BP ASA P 40

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

983 16/3, 17/1,2, 25/12,

26/8,10,11 Equinor Energy AS O 40

Petoro AS P 20

Total E&P Norge AS P 20 Faroe Petroleum Norge AS P 20

1 2 Acquire broadband 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

984 25/7 DNO Norge AS O 40

Source Energy AS P 30

Vår Energi AS P 30

1 2 Acquire broadband 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

(8)

985 25/5,6,8,9 Vår Energi AS O 40

Petoro AS P 20

Aker BP ASA P 20

Pandion Energy AS P 20

1 2 Aquire new broadband 3D seismic and EM feasibility study

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

986 25/2,3, 30/11,12 Aker BP ASA O 30

Petoro AS P 30

Wellesley Petroleum AS P 20

DNO Norge AS P 20

1 2 Drill one firm exploration well

Decision: Concretize (BoK) or Drop 2 2 Conceptual studies

Decision: Continuation (BoV) or Drop

3 1 Prepare development plan Decision: Submit PDO or Drop

IP: 5 EP: 25

987 30/7,8,10,11 Suncor Energy Norge AS O 40

Lundin Norway AS P 20

DNO Norge AS P 20

Vår Energi AS P 20

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

988 30/5 Lundin Norway AS O 40

DNO Norge AS P 30

Vår Energi AS P 30

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

(9)

IP - Initial Period Licence round TFO2018

989 36/7 DEA Norge AS O 40

Lundin Norway AS P 30

Concedo ASA P 30

1 2 Acquire broadband 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

990 34/9, 35/7,10 Equinor Energy AS O 40

Wellesley Petroleum AS P 30

DNO Norge AS P 30

1 1 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 6 EP: 20

991 34/7,8 DNO Norge AS O 60

Lundin Norway AS P 40

1 2 Acquire 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

992 33/6,9 Neptune Energy Norge AS O 40

Concedo ASA P 30

Petrolia NOCO AS P 30

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

(10)

993 33/5,6 Suncor Energy Norge AS O 50

Petoro AS P 20

Neptune Energy Norge AS P 30

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

994 34/1,2,4,5 Neptune Energy Norge AS O 40

Petrolia NOCO AS P 30

DNO Norge AS P 30

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

995 6304/4,5,7,8,9,10,11,12,

6305/7,10 DNO Norge AS O 60

INEOS E&P Norge AS P 40

1 1 G&G studies Decision: Acquire broadband 3D seismic or Drop

2 1 Acquire broadband 3D seismic

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

996 6304/6,9, 6305/1,4,7 A/S Norske Shell O 50

Equinor Energy AS P 50

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan

(11)

IP - Initial Period Licence round TFO2018

Decision: Submit PDO or Drop

IP: 7 EP: 15

997 6305/5,6,8,9,11,12,

6306/7 A/S Norske Shell O 35

INEOS E&P Norge AS P 30

Equinor Energy AS P 35

1 2 Reprocess 2D seismic Decision: 3D seismic acquisition or drill or Drop

2 (2) Acquire new 3D seismic Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan

Decision: Submit PDO or Drop

IP: 7 (9) EP: 15

998 6306/7,8 Spirit Energy Norge AS O 40

Lundin Norway AS P 30

Petrolia NOCO AS P 20

Neptune Energy Norge AS P 10

1 2 Aquire newly reprocessed 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 30

999 6406/12, 6407/10 Equinor Energy AS O 70

Neptune Energy Norge AS P 30

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

(12)

1000 6406/9,12, 6407/7,10 Neptune Energy Norge AS O 40 Suncor Energy Norge AS P 30

DEA Norge AS P 30

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

1001 6407/6,9 ConocoPhillips Skandinavia

AS O 60

OKEA AS P 20

Vår Energi AS P 20

1 2 Acquire and reprocess broadband 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1002 6407/4,5 Edison Norge AS O 60

Neptune Energy Norge AS P 40

1 2 Acquire and reprocess new 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

1003 6406/3,6 OKEA AS O 60

Wellesley Petroleum AS P 40

1 1 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well (not

deeper than 3800 meters) Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

(13)

IP - Initial Period Licence round TFO2018

IP: 6 EP: 20

1004 6507/11 OMV (Norge) AS O 70

Wintershall Norge AS P 30

1 2 Acquire and reprocess geophysical data Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1005 6404/9,12, 6405/4,7,10 Aker BP ASA O 60

Vår Energi AS P 40

1 1 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 2 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 30

1006 6405/3, 6406/1,

6505/12, 6506/10 Equinor Energy AS O 70 Faroe Petroleum Norge AS P 30

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1007 6506/7,8,10 Faroe Petroleum Norge AS O 40

OMV (Norge) AS P 20

Spirit Energy Norge AS P 20

Equinor Energy AS P 20

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

(14)

IP: 7 EP: 20 1008 6506/2,3,5,6,8,

6507/1,4 Aker BP ASA O 60

Wellesley Petroleum AS P 40

1 2 Drill one firm exploration well

Decision: Concretize (BoK) or Drop 2 2 Conceptual studies

Decision: Continuation (BoV) or Drop

3 1 Prepare development plan Decision: Submit PDO or Drop

IP: 5 EP: 25

1009 6506/6, 6507/4 ConocoPhillips Skandinavia

AS O 65

PGNiG Upstream Norway

AS P 35

1 2 Drill one firm exploration well

Decision: Concretize (BoK) or Drop 2 2 Conceptual studies

Decision: Continuation (BoV) or Drop

3 1 Prepare development plan Decision: Submit PDO or Drop

IP: 5 EP: 25

1010 6506/3, 6507/1,

6606/12, 6607/10 DEA Norge AS O 60

Vår Energi AS P 40

1 2 Reprocess 3D seismic Decision: Acquire 3D seismic or Drop 2 2 Acquire 3D seismic

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 9 EP: 15

1011 6509/11,12, 6510/10 Equinor Energy AS O 60

Lundin Norway AS P 40

1 1 G&G studies

Decision: 3D seismic acquisition or Drop 2 2 Acquire new 3D seismic

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 2 Prepare development plan Decision: Submit PDO or Drop

(15)

IP - Initial Period Licence round TFO2018

IP: 9 EP: 20

1012 6507/6,

6508/2,3,4,5,6,9 Equinor Energy AS O 40

A/S Norske Shell P 35

Spirit Energy Norge AS P 25

1 1 G&G studies

Decision: 3D seismic acquisition or drill or Drop

2 (2) Acquire new 3D seismic Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan

Decision: Submit PDO or Drop

IP: 6 (8) EP: 25

1013 6608/10,11 Petrolia NOCO AS O 60

INEOS E&P Norge AS P 40

1 2 Acquire 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 15

1014 6610/7,8,9,10,11,12,

6611/7,10 Equinor Energy AS O 70

Wellesley Petroleum AS P 30

1 1 G&G studies

Decision: Reprocess 3D seismic or Drop

2 2 Reprocess 3D seismic Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 8 EP: 20

(16)

1015 6607/8,9,11 INEOS E&P Norge AS O 70

DNO Norge AS P 30

1 1 Acquire 2D seismic Decision: 3D seismic acquisition or Drop 2 3 Acquire new 3D seismic

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 9 EP: 30

1016 6607/2,3,4,5,6, 6608/1 OMV (Norge) AS O 60

INPEX Norge AS P 40

1 2 Reprocess 3D seismic and EM feasibility study Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1017 6607/3, 6608/1 PGNiG Upstream Norway

AS O 50

Equinor Energy AS P 50

1 2 Reprocess 3D seismic and EM feasibility study Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1018 6604/2,3, 6605/1,2,

6705/11 OMV (Norge) AS O 40

Wintershall Norge AS P 30

Equinor Energy AS P 30

1 1 G&G studies

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO

(17)

IP - Initial Period Licence round TFO2018

or Drop

IP: 6 EP: 15

1019 6704/12, 6705/10 Equinor Energy AS O 50

OMV (Norge) AS P 20

Wintershall Norge AS P 20

M Vest Energy AS P 10

1 1 G&G studies

Decision: 3D seismic acquisition or drill or Drop

2 (3) Acquire new 3D seismic Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan

Decision: Submit PDO or Drop

IP: 6 (9) EP: 20

1020 6707/1,2,3,5 Wintershall Norge AS O 40

OMV (Norge) AS P 25

Equinor Energy AS P 35

1 2 Acquire new 2D seismic Decision: 3D seismic acquisition or Drop 2 2 Acquire new 3D seismic

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 9 EP: 20

1021 7019/2,3, 7020/1,

7119/12, 7120/10 DEA Norge AS O 50

DNO Norge AS P 50

1 2 Reprocess 3D seismic (consider acquisition of reprocessed 3D seismic) Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

(18)

1022 7121/9, 7122/7 Aker BP ASA O 40

Concedo ASA P 30

DNO Norge AS P 30

1 2 Reprocess 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 25

1023 7123/6, 7124/1,2,4,5 Edison Norge AS O 50

Lundin Norway AS P 50

1 2 Acquire 3D seismic and EM feasibility study Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 20

1024 7125/2,3, 7126/1,2,

7225/12, 7226/7,10,11 Repsol Norge AS O 70

DNO Norge AS P 30

1 2 Reprocess 3D seismic Decision: 3D seismic acquisition or drill or Drop

2 (2) Acquire new 3D seismic Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan

Decision: Submit PDO or Drop

IP: 7 (9) EP: 20

1025 S 7218/6,9,

7219/4,5,6,7,8 Partially stratigraphical -

northwestern part above top Kolmule Formation.

Vår Energi AS O 30

Petoro AS P 20

Equinor Energy AS P 50

1 3 Acquire new 3D seismic Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan

(19)

IP - Initial Period Licence round TFO2018

Decision: Submit PDO or Drop

IP: 8 EP: 25

1026 7221/6,9,

7222/4,5,6,7,8,9 Aker BP ASA O 40

Petoro AS P 30

Equinor Energy AS P 30

1 1 G&G studies Decision: Acquire geophysical data or Drop

2 2 Acquire geophysical data (2D seismic and/or 3D seismic and/or EM data) Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 8 EP: 25

1027 7220/3, 7221/1,2,4,5 Lundin Norway AS O 40

INPEX Norge AS P 20

DEA Norge AS P 20

DNO Norge AS P 20

1 3 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 8 EP: 20

1028 7222/2,3 Aker BP ASA O 50

Petoro AS P 20

Equinor Energy AS P 30

1 1 G&G studies Decision: Acquire geophysical data or Drop

2 2 Acquire geophysical data (acquire and/or reprocess 3D seismic and/or acquire EM data)

Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 8 EP: 25

(20)

1029 7221/3, 7222/1,2,3,

7321/12, 7322/10,11,12 Lundin Norway AS O 40

DNO Norge AS P 40

Spirit Energy Norge AS P 20

1 2 Acquire and reprocess 3D seismic

Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 30

1030 7223/2,3, 7224/1 Aker BP ASA O 50

Equinor Energy AS P 50

1 1 G&G studies Decision: Acquire geophysical data or Drop

2 2 Acquire geophysical data (2D seismic and/or 3D seismic and/or EM data) Decision: Drill or Drop 3 2 Drill exploration well

Decision: Concretize (BoK) or Drop 4 2 Conceptual studies

Decision: Continuation (BoV) or Drop

5 1 Prepare development plan Decision: Submit PDO or Drop

IP: 8 EP: 25

1031 7323/7,8 Spirit Energy Norge AS O 40

Petoro AS P 20

Aker BP ASA P 20

Equinor Energy AS P 20

1 2 Acquire new EM data Decision: Drill or Drop 2 2 Drill exploration well

Decision: Concretize (BoK) or Drop 3 2 Conceptual studies

Decision: Continuation (BoV) or Drop

4 1 Prepare development plan Decision: Submit PDO or Drop

IP: 7 EP: 30

Referanser

RELATERTE DOKUMENTER

R on the x-axis is respiration at 65 d post exposure (the recovery period), with explants being maintained at ambient temperatures (7 °C) after the 14 d experimental

In regions of warmer winter climate variation in SD is dominated by temperature, and long-term trends are mainly negative.. Short-term trends start out weak overall in the fi rst

The inner ring road connects the site directly to the cen- tral business dis- trict as well as the ordinary road cut through the canal, connecting to the outer ring

Women discriminated Public authorities Public authorities Public authorities against su press information inefficient accept bribes.. in the measurement instrument. For the

“It so happens that small differences in the initial state of the system can lead to very large differences in its final state. A small error in the former could then produce

In: Lecture Notes in Informatics, BIOSIG 2011, Proceedings - International Conference of the Biometrics Special Interest Group; 8.-9.. Bonn: Gesellschaft

[r]

(2008b) ‘The Cyclades, the East Aegean Islands and the western Asia Minor: Their Relations in the Aegean Late Neolithic and Early Bronze Age’.. In The Aegean in the