• No results found

Reimagine a Factory

N/A
N/A
Protected

Academic year: 2022

Share "Reimagine a Factory"

Copied!
40
0
0

Laster.... (Se fulltekst nå)

Fulltekst

(1)

Reimagine a Factory

5. Posters

Diploma student Peder Ravneng

Supervisor Erik Langdalen

External supervisor Wenche Andreassen

Institute of Form, Theory and History at the

Oslo School of Architecture and Design (AHO)

(2)

Construction site Frederik II videregående skole Construction site

Arena Fredrikstad

C onstruction sit

e

Offic e building

Construction site Trosvikstranda city development Proposed program:

Residence for Artists

Possible densification at Trosvikstranda

Fredrikstad stadion Høgskolen i

Østfold Grocery store

Kulturskolen

Legevakt

Grocery store

Abandoned glass insulator

factory

Bakery

Pub Pub

Pub Gym

Gym Potential new ferry stop

Ferry stop

N 1 20 30

Existing situationplan

A2 / 1:1000

(3)

A A Storage Treatment dept.

Unused entrances

Production area Electronic supply store

Entrance

6 2

2

5

5 5

1

1

Parking Ovens

Empty Workshop

Glomma

8 4

4

7 3

3

6

6 6

6

7 6

7

7 7

7

8 8

8

1

N 10

Existing ground floor plan

A3 / 1:500

(4)

A A Storage Cantine

Production area Offices

6

6

2

2

5 1

Bridge Labratorium

Toilets Empty

8

8

8

4

7

7

7 7

3

3

3

3

1

1

5

5

1

N 10

4 3

3

Existing first floor plan

A3 / 1:500

(5)

2,4 m 3 m

3 m

2,4 m 3 m

12 m 3 m 6 m

5,7 m

3 m 7 m

3 m 22 m

Keram Silo

The Factory Niro

Raw Material storage The Storage shed

Section AA

A3 / 1:500

(6)

Removed buildings Production line Semi-public path (vein) Public path (artery)

Preservation strategy

The Artery as the mediator between private and public spaces

1 2 3 4 5 6 7

1

2 3

4 5

6

7

(7)

First year The Artery

Create an attractive riverfront

Niro building

5 - 10 years New access point 1 - 5 years

Continuation of the Artery Make the buildings public The Raw Material storage

The shed

The Composite building

15 - 20 years

Extension of the Artery into the factory

The Factory The Ovens

Strategies

Gradually development of the site

Concept and time span

(8)

Removal of the Niro building

- Create an attractive riverfront Strategy

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

First year

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(9)

New ferry stop Lower sun deck

Flea market Park

Market square

Grocery store

Bus stop Brynildsen

factory

Public passage New loading

dock

Workshop parking

Parking Parking

Direction Trosvikstranda

Direction city centre

Upper sun deck

Seating area Sculpture park

Bicycle path

Bicycle parking P ublic path ”The Ar ter y”

Bicycle parking

Riverfront plan A3 / 1:1000

(All texturized shapes are additions)

Strategy First year

(10)

Strategy First year Illustration

Riverfront

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(11)

The Raw Material storage becomes THE GALLERY

Strategy 1 - 5 years

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(12)

Strategy 1- 5 years The Raw Material storage

Current interior

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

(13)

Strategy

The Raw Material storage

Interventions

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1- 5 years

(14)

OPEN Windows

Expose the building for daylight

OPEN

Bricked opening

Re-connect to the shed REMOVE

Rusty roof and light walls Expose the structure and gain more light

ADD Replacement of roof as a new

floor Introduce porcelain as a

architectural element New entrances ADD

Make the Raw Material storage a more public and attractive space.

- +

o

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Raw Material storage - The Gallery Isometric interventions

A3 / 1:500

Strategy 1- 5 years

(15)

Raw Material storage - The Gallery A3 / Plan 1:200

Strategy 1- 5 years

To 2nd floor Café

Separate exhibiton All changes marked in ORANGE Seating area

6 2

5 1

Storage Information desk

Piveting walls Temporary exhibition space

8 4

7 3

1

1 2

3 4

5 7 8

6

6

The river promenade

The market shed The Artery

public path The shed

B B

(16)

Strategy

THE GALLERY

A3 / Section BB 1:200 + Detail 1:50 / 1:1

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Tile detail 1:1:

Extraction of kaolin createas a translucent look Facade detail 1:50:

Contrast between rough concrete and fine porcelain.

Drawing 1:200:

Short section of the Gallery.

1- 5 years

(17)

THE GALLERY

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

Strategy 1 - 5 years

(18)

Strategy 1 - 5 years The Shed becomes

THE WORKSHOP

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(19)

Strategy

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1 - 5 years The Shed

Current interior

(20)

Strategy The Shed

Interventions

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1 - 5 years

(21)

REMOVE Light walls

Expose the flexible space.

REMOVE Roof sheets

Expose the wooden trusses and gain more light.

2. EXPOSE Roof

Expose the structure and wooden trusses to gain more light.

-

o

Insulation ADD

Make the space suitable for operations 365 days /year.

+

Strategy

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1 - 5 years The Shed - The Workshop

Isometric interventions

A3 / 1:500

(22)

Strategy 1 - 5 years

Lounge area Creative studios

Shop All changes marked in ORANGE Ceramic turners

6 2

5 1

Outdoor area Workspace

Washing station Oven stations

8 4

7 3

1 1

2

2

3 3

4 4

5

6

8

7

Preserved brick wall

Re-insulated walls

The Gallery

The market shed The Artery

public path Composite building

The Shed - The Workshop Plan

A3 / 1:200

(23)

Strategy 1 - 5 years The Architectural Porcelain Workshop

Illustration

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(24)

Composite building becomes VELFERDSHUSET

Strategy 1 - 5 years

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(25)

Composite building Current interior

Strategy 1 - 5 years

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

(26)

Composite building Interventions

Strategy

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1 - 5 years

(27)

-

+

o

OPEN

The covers from windows Expose daylight

EXPOSE Openings

Gain daylight and visibilty from the outside

REMOVE Rotten floors

Expose the structure and a double height space

ADD Communication core Make the 1st floor universal

accesible + add toilets.

Strategy

Composite

The Factory

The Niro building The Raw Material storage The Shed

REMOVED CLEANSED

INJECTED

Strategies

Chosen buildings to develop

1 - 5 years Composite building - Velferdsbygget

Isometric interventions

A3 / 1:500

(28)

Strategy 1 - 5 years

New toilets Auditorium

Wardrobe All changes marked in ORANGE Upcycling plant

6 2

5 1

Technical room New elevator

4 3

1

2 2

3

4 4

5 6

The Gallery The Workshop

The market shed

The Artery public path The Artery

public path

The Artery public path Treatment building Kitteriet

Composite building - Velferdsbygget Ground floor plan

A3 / 1:200

C C

D D

(29)

Strategy 1 - 5 years

Elevator Lecture room Bridge to Treatment Meeting room

Toilet All changes marked in ORANGE Office

6 7 8 2

5 1

Staircase Viewing platform

4 3

Velferdsbygget possible extension First floor plan

A3 / 1:500

3

1 1

1 1

2

1

8

6 4

4

7 5

7 1

1

The Gallery The Workshop

The market shed

The Artery public path

C C

D D

(30)

Strategy 1 - 5 years

Porcelain upcycling plant with viewing platform.

The Artery public path The Artery

public path

Auditoriums in the ground floor, and office spaces in the second floor.

Composite building - Velferdsbygget Section CC

A3 / 1:200

(31)

Strategy 1 - 5 years Composite building - Velferdsbygget

Section DD

Illustration of the possible upcycling plant

Porcelain upcycling plant with viewing platform.

The Artery public path The Architectural

porcelain workshop

(32)

First year The Artery

Reverted the historical public path and created an

attractive riverfront

1 - 5 years

Continuation of the Artery The Raw Material storage transformed to the Gallery

1 - 5 years

Continuation of the Artery The shed

transformed to an architectural porcelain

workshop

1 - 5 years

Continuation of the Artery The Composite building

transformed to Velferdshuset

Results after five years

Strategy 1 - 5 years

(33)

Strategy 10 years Gradually development of the Factory

Concept and time span

10 years

The Factory third floor transformed to the Maker Space

15 years

Void transformed to new main access point

20 years

The Oven building gaining a public

path above the production

(34)

WC

- +

o

OPEN Third floor

Proposed makerspace.

OPEN Windows

Exploit the big window for more daylight.

REMOVE

Parts of concrete floor

Expose the full height of building creating an atrium, gaining daylight in the long and dark building.

REMOVE Staircase

Due to its condition. Replaced by a floor window.

REMOVE Parts of walls

Gaining an public overview of the private production

ADD Communication core Connect the different floors and

neighhbouring buildings.

ADD Bridge Gaining a public persepective

to production in addition to a connection to the Værstebrua.

Strategy 10 years

The Factory - Maker space Isometric interventions

A3 / 1:1000

(35)

MAKER SPACE

Strategy 10 years

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

(36)

New access point Interventions

Strategy 15 years

Glazed ”lid” Sawed ”lid”

Glazed ”belt”

Shaping forms with a mixture of porcelain and stones. Thrown away after use.

Illustration seen towards the

proposed communication core.

(37)

Public path above production Proposed intervention

Strategy 20 years

(38)

2

2 2

1

4

Storage Velferdshuset

Production area

Parking The Workshop

Electronic supply store

6 10

2

5 9

1

The Gallery Public riverfront Ovens

New potential volume Communication Workshop

8 12

4

7 11

3

3

6

9 7

7

6

10

11

11 11

11

8 6

12

5 5

5

1

N 10

Developed ground floor plan A3 / 1:500

All changes marked in ORANGE

(39)

1. DOCUMENTATION OF THE

SPECIFIC SITE 2. RESEARCH REGULATION AND

MUNICIPALITY PLANS 3. VALUE ASSESSMENT AND

MAPPING 4. PRODUCTION AND FLOW 5. INTERVENTIONS

Dig into the history, and find how and why the factory played a role in the city’s history. Find plans,

sections, pictures and other relevant documents.

Possible sources can be The National Library (nb.no), Digitalt Museum and the specific Municipality’s own sites.

Also, get a grasp of how the site is today, through the camera lens.

Find out if there is any ongoing plans

at the site, or in neighbouring areas. With the Municipality plans in mind, create a value assessment where you research the different buildings and its values.

Find out how the building mass works.

Relevant diagrams can be mapping of structures, usage, communication patterns and condition of the different buildings.

Map how the specific products that are produced and how that flows around in the complex.

In addition, what is the future of the products? How is the product recycled? Can it be used again, and for what?

Based on your findings, you can start your interventions at the site. Possible interventions can be:

- Remove elements in bad condition - Remove non-bearing / low value elements

- Remove loose elements and clean - Reopen blocked doors and windows - Reactivate unused stairs and

passages

- Restore elements to original state - Add new surface

- Add new elements

The Artery’s toolbox

Overall strategy

(40)

Illustration

The site with interventions after 20 years

Strategy 20 years

Logistic square

Logistic passage

Flexible shed

Public path

Phase 1: Revert

Removal of the Niro building (red).

Chosen transformated buildings (grey).

Activating the riverside, public access to the site reveiling a transparent production.

Activating the abandoned buildings, and connect them the artery.

Experimenting with excess porcelain materials for architectural purposes.

Activating the in between spaces and create different squares and paths through the site.

Activating the factory into the artery, and create connection directly to Værstebrua.

Fill in non-usable void, and create a main communication core and reception.

Create an atrium in the factory building, and prepare it to be a makerspace.

Phase 2: Cleanse

Phase 3: Inject

Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.

Referanser

RELATERTE DOKUMENTER

Therefore it appears, that every priſm inclining on its baſe, as well as every upright one, is equal to a rectangular parallelepipedon of equal baſe and altitude z and,

In this paper we argue that one is free insofar as one exercises one’s real causal powers, and we will offer the outlines and some details of what such a positive account would

Whether it was the health college, the medicinal agency, the medicinal office or, later, the offices of the county public health officers and the National Board of Health,

Pilar en og to beskrives som meget viktige av Ban Ki Moon i hans Implementing the Responsibility to Protect, men intervensjonen i Libya er ikke nødvendigvis et eksempel på

15 In the temperate language of the UN mission in Afghanistan (UNAMA), the operations of NDS Special Forces, like those of the Khost Protection Force, “appear to be coordinated

Hence, alfo, a line falling upon two parallel lines, makes the fum of the two internal angles SDC-F QCD on the fame fide of it, equal to two right-* angles: for the angle SDC being

A quantitative frame-wise comparison between video predictions and ground truth videos is performed, before finally re- viewing the results based on the proposed evaluation

As a visiting PhD candidate, I had short stays at the School of Public Health, Addis Ababa University (2015, 2016), the Department of Maternal, Newborn, Child and Adolescent