Reimagine a Factory
5. Posters
Diploma student Peder Ravneng
Supervisor Erik Langdalen
External supervisor Wenche Andreassen
Institute of Form, Theory and History at the
Oslo School of Architecture and Design (AHO)
Construction site Frederik II videregående skole Construction site
Arena Fredrikstad
C onstruction sit
e
Offic e building
Construction site Trosvikstranda city development Proposed program:
Residence for Artists
Possible densification at Trosvikstranda
Fredrikstad stadion Høgskolen i
Østfold Grocery store
Kulturskolen
Legevakt
Grocery store
Abandoned glass insulator
factory
Bakery
Pub Pub
Pub Gym
Gym Potential new ferry stop
Ferry stop
N 1 20 30
Existing situationplan
A2 / 1:1000
A A Storage Treatment dept.
Unused entrances
Production area Electronic supply store
Entrance
6 2
2
5
5 5
1
1
Parking Ovens
Empty Workshop
Glomma
8 4
4
7 3
3
6
6 6
6
7 6
7
7 7
7
8 8
8
1
N 10
Existing ground floor plan
A3 / 1:500
A A Storage Cantine
Production area Offices
6
6
2
2
5 1
Bridge Labratorium
Toilets Empty
8
8
8
4
7
7
7 7
3
3
3
3
1
1
5
5
1
N 10
4 3
3
Existing first floor plan
A3 / 1:500
2,4 m 3 m
3 m
2,4 m 3 m
12 m 3 m 6 m
5,7 m
3 m 7 m
3 m 22 m
Keram Silo
The Factory Niro
Raw Material storage The Storage shed
Section AA
A3 / 1:500
Removed buildings Production line Semi-public path (vein) Public path (artery)
Preservation strategy
The Artery as the mediator between private and public spaces
1 2 3 4 5 6 7
1
2 3
4 5
6
7
First year The Artery
Create an attractive riverfront
Niro building
5 - 10 years New access point 1 - 5 years
Continuation of the Artery Make the buildings public The Raw Material storage
The shed
The Composite building
15 - 20 years
Extension of the Artery into the factory
The Factory The Ovens
Strategies
Gradually development of the site
Concept and time span
Removal of the Niro building
- Create an attractive riverfront Strategy
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
First year
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
New ferry stop Lower sun deck
Flea market Park
Market square
Grocery store
Bus stop Brynildsen
factory
Public passage New loading
dock
Workshop parking
Parking Parking
Direction Trosvikstranda
Direction city centre
Upper sun deck
Seating area Sculpture park
Bicycle path
Bicycle parking P ublic path ”The Ar ter y”
Bicycle parking
Riverfront plan A3 / 1:1000
(All texturized shapes are additions)
Strategy First year
Strategy First year Illustration
Riverfront
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
The Raw Material storage becomes THE GALLERY
Strategy 1 - 5 years
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
Strategy 1- 5 years The Raw Material storage
Current interior
CompositeThe Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Strategy
The Raw Material storage
Interventions
CompositeThe Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1- 5 years
OPEN Windows
Expose the building for daylight
OPEN
Bricked opening
Re-connect to the shed REMOVE
Rusty roof and light walls Expose the structure and gain more light
ADD Replacement of roof as a new
floor Introduce porcelain as a
architectural element New entrances ADD
Make the Raw Material storage a more public and attractive space.
- +
o
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Raw Material storage - The Gallery Isometric interventions
A3 / 1:500
Strategy 1- 5 years
Raw Material storage - The Gallery A3 / Plan 1:200
Strategy 1- 5 years
To 2nd floor Café
Separate exhibiton All changes marked in ORANGE Seating area
6 2
5 1
Storage Information desk
Piveting walls Temporary exhibition space
8 4
7 3
1
1 2
3 4
5 7 8
6
6
The river promenade
The market shed The Artery
public path The shed
B B
Strategy
THE GALLERY
A3 / Section BB 1:200 + Detail 1:50 / 1:1
CompositeThe Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Tile detail 1:1:
Extraction of kaolin createas a translucent look Facade detail 1:50:
Contrast between rough concrete and fine porcelain.
Drawing 1:200:
Short section of the Gallery.
1- 5 years
THE GALLERY
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
Strategy 1 - 5 years
Strategy 1 - 5 years The Shed becomes
THE WORKSHOP
CompositeThe Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
Strategy
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1 - 5 years The Shed
Current interior
Strategy The Shed
Interventions
CompositeThe Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1 - 5 years
REMOVE Light walls
Expose the flexible space.
REMOVE Roof sheets
Expose the wooden trusses and gain more light.
2. EXPOSE Roof
Expose the structure and wooden trusses to gain more light.
-
o
Insulation ADD
Make the space suitable for operations 365 days /year.
+
Strategy
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1 - 5 years The Shed - The Workshop
Isometric interventions
A3 / 1:500
Strategy 1 - 5 years
Lounge area Creative studios
Shop All changes marked in ORANGE Ceramic turners
6 2
5 1
Outdoor area Workspace
Washing station Oven stations
8 4
7 3
1 1
2
2
3 3
4 4
5
6
8
7
Preserved brick wall
Re-insulated walls
The Gallery
The market shed The Artery
public path Composite building
The Shed - The Workshop Plan
A3 / 1:200
Strategy 1 - 5 years The Architectural Porcelain Workshop
Illustration
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
Composite building becomes VELFERDSHUSET
Strategy 1 - 5 years
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
Composite building Current interior
Strategy 1 - 5 years
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
Composite building Interventions
Strategy
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1 - 5 years
-
+
o
OPEN
The covers from windows Expose daylight
EXPOSE Openings
Gain daylight and visibilty from the outside
REMOVE Rotten floors
Expose the structure and a double height space
ADD Communication core Make the 1st floor universal
accesible + add toilets.
Strategy
Composite
The Factory
The Niro building The Raw Material storage The Shed
REMOVED CLEANSED
INJECTED
Strategies
Chosen buildings to develop
1 - 5 years Composite building - Velferdsbygget
Isometric interventions
A3 / 1:500
Strategy 1 - 5 years
New toilets Auditorium
Wardrobe All changes marked in ORANGE Upcycling plant
6 2
5 1
Technical room New elevator
4 3
1
2 2
3
4 4
5 6
The Gallery The Workshop
The market shed
The Artery public path The Artery
public path
The Artery public path Treatment building Kitteriet
Composite building - Velferdsbygget Ground floor plan
A3 / 1:200
C C
D D
Strategy 1 - 5 years
Elevator Lecture room Bridge to Treatment Meeting room
Toilet All changes marked in ORANGE Office
6 7 8 2
5 1
Staircase Viewing platform
4 3
Velferdsbygget possible extension First floor plan
A3 / 1:500
3
1 1
1 1
2
1
8
6 4
4
7 5
7 1
1
The Gallery The Workshop
The market shed
The Artery public path
C C
D D
Strategy 1 - 5 years
Porcelain upcycling plant with viewing platform.
The Artery public path The Artery
public path
Auditoriums in the ground floor, and office spaces in the second floor.
Composite building - Velferdsbygget Section CC
A3 / 1:200
Strategy 1 - 5 years Composite building - Velferdsbygget
Section DD
Illustration of the possible upcycling plant
Porcelain upcycling plant with viewing platform.
The Artery public path The Architectural
porcelain workshop
First year The Artery
Reverted the historical public path and created an
attractive riverfront
1 - 5 years
Continuation of the Artery The Raw Material storage transformed to the Gallery
1 - 5 years
Continuation of the Artery The shed
transformed to an architectural porcelain
workshop
1 - 5 years
Continuation of the Artery The Composite building
transformed to Velferdshuset
Results after five years
Strategy 1 - 5 years
Strategy 10 years Gradually development of the Factory
Concept and time span
10 years
The Factory third floor transformed to the Maker Space
15 years
Void transformed to new main access point
20 years
The Oven building gaining a public
path above the production
WC
- +
o
OPEN Third floor
Proposed makerspace.
OPEN Windows
Exploit the big window for more daylight.
REMOVE
Parts of concrete floor
Expose the full height of building creating an atrium, gaining daylight in the long and dark building.
REMOVE Staircase
Due to its condition. Replaced by a floor window.
REMOVE Parts of walls
Gaining an public overview of the private production
ADD Communication core Connect the different floors and
neighhbouring buildings.
ADD Bridge Gaining a public persepective
to production in addition to a connection to the Værstebrua.
Strategy 10 years
The Factory - Maker space Isometric interventions
A3 / 1:1000
MAKER SPACE
Strategy 10 years
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.
New access point Interventions
Strategy 15 years
Glazed ”lid” Sawed ”lid”
Glazed ”belt”
Shaping forms with a mixture of porcelain and stones. Thrown away after use.
Illustration seen towards the
proposed communication core.
Public path above production Proposed intervention
Strategy 20 years
2
2 2
1
4
Storage Velferdshuset
Production area
Parking The Workshop
Electronic supply store
6 10
2
5 9
1
The Gallery Public riverfront Ovens
New potential volume Communication Workshop
8 12
4
7 11
3
3
6
9 7
7
6
10
11
11 11
11
8 6
12
5 5
5
1
N 10
Developed ground floor plan A3 / 1:500
All changes marked in ORANGE
1. DOCUMENTATION OF THE
SPECIFIC SITE 2. RESEARCH REGULATION AND
MUNICIPALITY PLANS 3. VALUE ASSESSMENT AND
MAPPING 4. PRODUCTION AND FLOW 5. INTERVENTIONS
Dig into the history, and find how and why the factory played a role in the city’s history. Find plans,
sections, pictures and other relevant documents.
Possible sources can be The National Library (nb.no), Digitalt Museum and the specific Municipality’s own sites.
Also, get a grasp of how the site is today, through the camera lens.
Find out if there is any ongoing plans
at the site, or in neighbouring areas. With the Municipality plans in mind, create a value assessment where you research the different buildings and its values.
Find out how the building mass works.
Relevant diagrams can be mapping of structures, usage, communication patterns and condition of the different buildings.
Map how the specific products that are produced and how that flows around in the complex.
In addition, what is the future of the products? How is the product recycled? Can it be used again, and for what?
Based on your findings, you can start your interventions at the site. Possible interventions can be:
- Remove elements in bad condition - Remove non-bearing / low value elements
- Remove loose elements and clean - Reopen blocked doors and windows - Reactivate unused stairs and
passages
- Restore elements to original state - Add new surface
- Add new elements
The Artery’s toolbox
Overall strategy
Illustration
The site with interventions after 20 years
Strategy 20 years
Logistic square
Logistic passage
Flexible shed
Public path
Phase 1: Revert
Removal of the Niro building (red).
Chosen transformated buildings (grey).
Activating the riverside, public access to the site reveiling a transparent production.
Activating the abandoned buildings, and connect them the artery.
Experimenting with excess porcelain materials for architectural purposes.
Activating the in between spaces and create different squares and paths through the site.
Activating the factory into the artery, and create connection directly to Værstebrua.
Fill in non-usable void, and create a main communication core and reception.
Create an atrium in the factory building, and prepare it to be a makerspace.
Phase 2: Cleanse
Phase 3: Inject
Move the storage facility to the the abandoned Kitteri, to free to shed to public purposes along the riverside.