• No results found

Økonomistyring, prosjektledelse og innovasjon 3MØS260

N/A
N/A
Protected

Academic year: 2022

Share "Økonomistyring, prosjektledelse og innovasjon 3MØS260"

Copied!
6
0
0

Laster.... (Se fulltekst nå)

Fulltekst

(1)

Økonomistyring, prosjektledelse og innovasjon 3MØS260

Pensum for studieåret

Obligatorisk litteratur

Akrich, M., Callon, M. & Latour, B. (2002). The key to success in innovation: The art of interessement Part I . International Journal of Innovation Management,  6(2), 187–206.

https://www.researchgate.net/profile/Madeleine_Akrich/publication/253284147_The_key_to_success_in_innovation_part_I_The_art_of_interessement/links/53edf5300cf26b9b7dc639a8/The-key-to-success-in-innovation-part-I-The-art-of-interessement.pdf  

 

Akrich, M., Callon, M. & Latour, B. (2002). The key to success in innovation: The art of choosing good spokespersons Part II. International Journal of Innovation Management,  6(2), 207–225.  

  http://www.bruno-latour.fr/sites/default/files/downloads/88bis-MANAGEMENT-2.pdf Christensen, S. & Kreiner, K. (1991). Projektledelse i løst koblede systemer – ledelse og

. København: Jurist – og Økonomforbundets Forlag.

læring i en ufuldkommen verden 1–115. 

Coutu, D. (2003). Sense and Reliability: A conversation with celebrated psychologist Karl. E. Weick. Harvard Business Review, 81(4), 84–90. 

http://ezproxy.inn.no/login?url=http://web.b.ebscohost.com/ehost/pdfviewer/pdfviewer?vid=4&sid=969d540d-ca4e-4ab7-8e1c-3b20f2c14bdf%40sessionmgr101  

Hvis du ikke får åpnet artikkelen gjennom lenken, søk på tidsskrifttittel i Oria:

  https://www.inn.no/bibliotek og klikk deg frem til artikkelen.

 

Czarniawska, B. (2010). Translation impossible? Accounting for a city project. 

, 23(3), 420–437. 

Accounting, Auditing & Accountability Journal

(2)

 

Davies, R. & Harty, C. (2013). Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project. Automation in Construction, 30, 15–24. 

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/S0926580512002191  

 

Dille, T. & Söderlund, J. (2013). Managing temporal misfits in institutional environments.

, 6 (3), 552–575. 

International Journal of Managing Projects in Business

https://www.researchgate.net/profile/Jonas_Soederlund/publication/257958741_Managing_temporal_misfits_in_institutional_environments_A_study_of_critical_incidents_in_a_complex_public_project/links/00b495267c202b5c90000000.pdf  

 

Flyvbjerg, B. (2006). From Nobel Prize to project management: getting the risks right.

, 37(3), 5–15.   

Project Management Journal https://arxiv.org/abs/1302.3642  

Georg, S. & Tryggestad, K. (2009). On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), 969–981. 

http://ezproxy.inn.no/login?url=http://web.b.ebscohost.com/ehost/pdfviewer/pdfviewer?vid=1&sid=e2a6af07-2117-4e3f-b5ac-8aa6b4c02381%40sessionmgr103  

Hvis du ikke får åpnet artikkelen gjennom lenken, søk på artikkeltittel i Oria:

  https://www.inn.no/bibliotek.

  Eller

Hvis du ønsker å åpne artikkelen i Taylor & Francis gjelder dette: denne artikkelen er kun tilgjengelig på campus. Søkes opp i databasen Taylor & Francis som du finner her:

https://www.inn.no/bibliotek/soeke-og-vurdere/databaser  

Harty, C., Tryggestad, K. & Jacobsen, P. H. (2015). Visualisations and calculations of spaces: Negotiating hospital design during onboarding. I A. Raiden and E.

Aboagye-Nimo, (Red.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 875–884.

Lokalisert på

http://www.arcom.ac.uk/-docs/proceedings/491b24c6660e734e8019129b79598b3c.pdf  

 

(3)

Hugosson, M., Stevik, K., Søberg, P. & Tryggestad, K. 2018 Forming innovative projects. in sustainable construction – how socio-technical connectivity shapes the building project and its context. Book chapter in international anthology: Malena I. Havenvid, Åse Linné, Lena E. Bygballe, Chris Harty (Eds.) The Connectivity of Innovation in the

(working title). In review and forthcoming.  

Construction Industry Legges ut i Canvas. 

 

Hugosson, M., Søberg, P. & Tryggestad, K. (2018).The role of the partner contract in Work in progress managing risk and uncertainty in innovative building projects.

(arbeidstittel, kan endres). Legges ut i Canvas. 

 

Kreiner, K. (1995). In search of relevance: Project management in drifting environments.

, 11(4), 335–346. 

Scandinavian Journal of Management

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/095652219500029U  

 

Lundin, R. A. & Söderholm, A. (1995). A Theory of the Temporary Organization.

. 11(4), 437–455. 

Scandinavian Journal of Management

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/095652219500036U  

 

Lundin, R.A. & Hällgren, M. (Red.) (2014). Advancing Research on Projects and Temporary . Stockholm: Copenhagen Business School Press & Liber. (278 sider).  

Organizations

Utdrag: Lundin, R.A. & Hällgren, M. An Introduction by editors (s.7–18), Kreiner K.

Chapter 1 Restoring project success as a phenomenon (s.19–38), Thomas, J., Georg, S. &

Cicmil, S. Chapter 9 Project management as management of innovation (s.169–195), Lundin, R.A. & Hällgren, M. Chapter 14 On the notions of temporality and organizing:

Reflections on future advances (s. 266–277) (skal ikke legges ut i Canvas).  

Revellino, S. & Mouritsen, J. (2009). The multiplicity of controls and the making of innovation. European Accounting Review, 18(2), 341–369. 

http://ezproxy.inn.no/login?url=http://web.b.ebscohost.com/ehost/pdfviewer/pdfviewer?vid=1&sid=7812981e-3a34-4fd4-beb7-25099f356966%40sessionmgr102  

Hvis du ikke får åpnet artikkelen gjennom lenken, søk på artikkeltittel i Oria:

(4)

Hvis du ønsker å åpne artikkelen i Taylor & Francis gjelder dette: denne artikkelen er kun tilgjengelig på campus. Søkes opp i databasen Taylor & Francis som du finner her:

https://www.inn.no/bibliotek/soeke-og-vurdere/databaser  

Sage, D., Dainty, A. & Brookes, N. (2013) Thinking the ontological politics of managerial and critical performatives: An examination of project failure. Scandinavian Journal of

, 29, 282–291. 

Management

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/S0956522113000067  

 

Themsen, T. N. & Skærbæk, P. (2018). The performativity of risk management

frameworks and technologies: The translation of uncertainties into pure and impure risks. Accounting, Organizations and Society. In press.

https://doi.org/10.1016/j.aos.2018.01.001 

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/S0361368218300011  

 

Tryggestad, K., Justesen, L. & Mouritsen, J. (2013) Project temporalities: How frogs can become stakeholders.  International Journal of Managing Projects in Business 6(1), 69–87. 

http://ezproxy.inn.no/login?url=https://www.emeraldinsight.com/doi/pdfplus/10.1108/17538371311291035  

 

Tryggestad, K. 2014. Projektledelse (s. 523–542). I: Vikkelsø, S. & Kjær, P. (Red.) Klassisk

. København: Hans Reitzel  

og moderne organisationsteori Legges ut i Canvas.

 

Yao, J. & Bjurström, E. (2015) Trends and challenges of future IC reporting: Experiences from Japan. I P. Ordoñes de Pablo & L. Edvinsson (Red.). Intellectual Capital in

. New York, NY: Routledge, 277–296.

Organizations, Non-Financial Reports and Accounts  

Legges ut i Canvas.

Anbefalt litteratur

(5)

Bjurström, E. & Roberts, H. (2007). The Principle of Connectivity - Networked Assets, Strategic Capabilities and Bundled Outcomes. I C. Chaminade & B. Catasús (Red.)

, Intellectual Capital Revisited – Paradoxes in the Knowledge Intensive Organization Cheltenham: Edgar Elgar Publishing, 45–60. (skal ikke legges ut i Canvas)     

Briers, M. & Chua, W. F. (2001). The role of actor-networks and boundary objects in management accounting change: a field study of an implementation of activity-based costing. Accounting, Organizations and Society, 26(3), 237–269. 

http://ezproxy.inn.no/login?url=https://www.sciencedirect.com/science/article/pii/S0361368200000295  

 

Brady, T. & Davies, A. (2004). Building Project capabilities: from exploratory to exploitative learning. Organization Studies, 25(9). Special Issue on Project-based organizations, Embeddedness and Repositories of Knowledge, 1601–1622. 

http://ezproxy.inn.no/login?url=http://journals.sagepub.com/doi/abs/10.1177/0170840604048002  

   

Enberg, C., Lindkvist, L. & Tell, F. (2006). Exploring the Dynamics of Knowledge Integration – Acting and Interacting in Project Teams. Management Learning, 37(2), 143–165. 

http://ezproxy.inn.no/login?url=http://journals.sagepub.com/doi/abs/10.1177/1350507606063440  

 

Dumay, J. (2014) Reflections on interdisciplinary accounting research: the state of the art of intellectual capital. Accounting, Auditing & Accountability Journal, 27(8), 1257–1264. 

http://ezproxy.inn.no/login?url=https://search.proquest.com/docview/1633942009?OpenUrlRefId=info:xri/sid:primo&accountid=43213  

 

Knight, F. H. (1921). Risk, Uncertainty and Profit. Boston, Massachusetts: Hart, Schaffner &

Marx; Houghton Mifflin Co. Reprint. Utdrag: “Chapter I The place of profit and

(6)

 

Kreiner, K. (2002). Tacit knowledge management: the role of artifacts. Journal of , 6(2), 112–123. 

Knowledge Management

http://ezproxy.inn.no/login?url=https://search.proquest.com/docview/230317765?OpenUrlRefId=info:xri/sid:primo&accountid=43213  

 

Mouritsen, J. (2006). Problematising intellectual capital research: Ostensive versus performative IC. Accounting, Auditing and Accountability Journal, 19(6), 820–841. 

http://ezproxy.inn.no/login?url=https://search.proquest.com/docview/849479942?rfr_id=info%3Axri%2Fsid%3Aprimo  

 

Smari S. R. (2014). Chapter 3 Relating temporary organizations to strategy concepts (s.

52-70). I Lundin, R.A. & Hällgren, M. (Red.) (2014). Advancing Research on Projects and . Stockholm: Liber & Copenhagen Business School Press.

Temporary Organizations (skal

ikke legges ut i Canvas) 

Referanser

RELATERTE DOKUMENTER

[r]

Sett opp utstyret og reguler banehellingen slik at vogna ruller med konstant fart når du gir den et lite puff. Monter kraftsensoren på vogna. Fest snora til loddet og

Sett opp pendelen og lysporten slik den nederste figuren viser. Pendel loddet skal henge slik at det blokkerer lysstrålen i lyspor ten. Vi måler farten til loddet når det passerer

Den mest praktfulle figuren på himmelen er kanskje Orion, den store jegeren som slåss med Tyren (Taurus), og som følges av Store hund (Canis major) og Lille hund (Canis minor) med

Sett sammen utstyret slik figuren over viser. Spenningskilden bør være jevnt regulerbar fordi spenningen og strømmen bør holdes så konstante som mulig. • Gjør målinger slik

Uttakspunktet er også så nær Mistras mmmingsos at det ikke påvirker lavvannsføringen i elva generelt. Lavvannsperioden er dessuten på en årstid da ingen

Mykje folk og mange born var samla til hausttakkefest i Lavik kyrkje søndag 29.september 2019.. Det vart ein flott og lang inngangsprosesjon der borna bar inn korger med

erfaringer rundt det å be om hjelp; 2) den subjektive opplevelsen av å gå i samtaleterapi; og 3) relasjon og tillit til terapeuten. Vi var opptatt av å ivareta kvinnene slik at de