M.Sc.
Thermal control of heavy vehicles
– system design and impact on tunnel projects.
Drawings
Fredrik Omdal
June 8, 2016
Contents
Appendix A General solutions i
Appendix B Plan over signing and marking xxiii Appendix C Rogfast, case study xlv
i
Appendix A
General solutions
i
Alternative 1A
ii
Alternative 1B
v
Alternative 1C
ix
Alternative 2A
xii
Alternative 2B
xv
Alternative 2C
xix
xxii
Appendix B
Plan over signing and marking
xxiii
Alternative 1A
xxiv
Control
Alternative 1B
xxvii
Control
Alternative 1C
xxxi
Control
Control
Alternative 2A
xxxiv
Control
Control
Alternative 2B
xxxvii
Control
Control
Alternative 2C
xli
Control
Control
xliv
Appendix C
Rogfast, case study
xlv
Geometry
Possible areas for the control
xlvi
North
alternatives
South
alternatives
Alternative 2A North
xlviii
(A1)
(A1)
Alternative 2A South
li
(A1)
(A1)
Alternative 2C North
liv
(A1)
Alternative 2C South
lvi
(A1)
Plan over signing and marking
Alternative 2A North
lviii
(A1)
Control Control
(A1)
Alternative 2C North
lxi
Control Control
(A1)
Control Control
(A1)