• No results found

List of new activities in Grønmo

N/A
N/A
Protected

Academic year: 2022

Share "List of new activities in Grønmo"

Copied!
35
0
0

Laster.... (Se fulltekst nå)

Fulltekst

(1)

Project title: New Grønmo park

Diploma candidate: Yang Zhang Student ID: s101681

Discipline: Architecture

Main supervisor: Neven Fuchs Mikac Secondary supervisor: Julie Aars

External supervisor: Thea Kvamme Hartmann

(2)

Contents

1. Site background

2. Architectural vision

3. Program

4. Scientific research

5. Design concept and diagrams

6. Architectural drawings

7. Model photos

(3)

1. Site background

Smestad Recycling center

Colosseum mini Recycling station Marienlyst mobile mini Recycling station

Uranienborg kirke mobile mini Recycling station Vestkanttorvet mobile mini Recycling station

Bentsehjømet mini Recycling station Løren mini Recycling station

Romsås mini Recycling station

Fredensborg mini Recycling station

Bygdøy garden waste reception Bygdøy mobile mini Recycling station

Fredensborg Recycling center Pilestredet park mini Recycling station Sofienbergparken mini Recycling station

Grefsen mini Recycling station

Kampen mini Recycling station Helsfyr mini Recycling station Kampen mini Recycling station

Etterstad mobile mini Recycling station Galgeberg mobile mini Recycling station

Tøyen mobile mini Recycling station

Tjuvholmen mobile mini Recycling station Grønland mobile mini Recycling station

Gamlebyen mobile mini Recycling station Kværnerbyen mobile mini Recycling station Vålerenga mobile mini Recycling station

Haraldrud Recycling center Lindeberglokalet Recycling center

Grønmo Recycling center Klemetsrudanlegget AS Returpunkt Sanitation Department

Haraldrud Sanitation Department

West Marka

East Marka North Marka

Lillo Marka

Gjelleråsen

OSLO

Romeriksåsen

Hook Woods

Bærums Marka

Kjekstad Marka

South Marka 7.5 km

5 km

2.5 km Bogerud Lambertseter

Bergkrystallen

Ljabru

Mortensrud Skullerud Sæter

Nordstrand

Ljan

Hauketo

Klemetsrud Holmlia

Prinsdal Hvervenbukta

Rosenholm

E18 NSB E6

Gjersrud Stensrud Grønmo RV 155

Waste material collection centers layout in Oslo

Site location Oslo border forest

Facilities around Grønmo

Main recycling center Sanitation Department Mini Recycling station Mobile mini Recycling station

Train route European route Secondary route T-bane route Tram route Station Hiking trail

Mortensrud school Mortensrud church

Klemesrudanlegget AS

Bjørnholt school

Klemetsrud school waste disposal

Grønmo Golfclub

RestaurantKindergarten

Accessories AS Rema 1000

(4)

Origional site situation Origional site picture

Grønmo is located in the south eastern part of Oslo, in the district of Søndre Nordstrand, approximately 12km southeast of the Oslo Centre. The size of the project site is around 42.5 hector, approximately 1.5 times the size of the Frogner Park. This area is close to Sørliveien and E6 highway on the west and Grønmo golf course on the north. On the south, east and partly north, this area is surrounded by Østmarka. It is an important gateway to the forest since many hiking trails start from here. It serves as good meeting places between the noisy city life and the quiet forest.

The district is highly multi cultural with 600 000 inhabitants. 47.7% are immigrants or have parents who are immigrants.

30% are less than 20 years old and 6% are more than 67 years old.

The Grønmo landfilled used to be the largest one in Northern Europe. Having functioned as Oslo’s main spot for the un- wanted since 1969, Grønmo covered over 8 million cubic meters of trash, more than 3 times of the volume of the Cheops pyramid. It was an enormous, artificial landscape built up from household waste, industrial waste, asbestos, hydroxide sludge, fly ash and etc.. It was closed in 2009. Today the waste is covered by a thin, green dressed, top cover preventing surface water from reaching in. Over 200 gas wells are built in Grønmo, making sure the continuous methane are directed transported into the nearby incinerator rather than leak out in the open air due to the anaerobic digestion of the waste.

Grønmo was entirely covered by forest in the past. The landscape within the area is hilly and characterised by low hills from the period of waste disposal. Part of the outskirts of the area are forest areas, where vegetation is high density with pine trees and some hardwoods. The landfilled area is partly grassy. It could rather be regarded as ugly scar in the beau- tiful natural Marka forest.

Right now, after the closure of the landfilled place, there are a recycling station, a sorting area and a composting plant on site.

Grønmo is one of the few areas in Oslo where it is possible to set up efficient area for the future oriented waste manage- ment.

(5)

1

2 3

5 4 7 6 9 8 1110 1312 1514 1716

18 19202122

2324 25

2627 28

29 3031

32 33

01 Administration office 02 Storage room for old tires 03 Storage

04 Reception room

05 Collection container for plaster 06 Collection container for mattresses 07 Collection container for wood

08 Collection container for cardboard and paper 09 Collection container for incinerated

10 Collection container for metal 11 Collection container for wood 12 Collection container for plastic

13 Collection container for things to landfill 14 Collection container for wood

15 Collection container for cardboard and paper 16 Collection container for incinerated

17 Collection container for impregnated wood 18 Dangerous waste

19 Electronics

Site boundary Composting Landfilled Water pond 20 Reuse

21 Reuse 22 Reuse

23 Collection area for asbestos 24 Collection area for PCB windows

(Norwegian-produced insulating glass windows produced 1965-1975)

(imported insulated glass windows produced until 1980, only from private customers) 25 Collection area for chloropherafine routes insulated glass windows (produced 1975-1990) 26 Collection area for garden waste grass, leaves, small twigs and diameter max 20cm branches 27 Collection area for roots, stumps and stems over 15 cm in diameter

28 Collection area for unused tiles, toilets and washbasins 29 Collection area for clean asphalt (bags must be emptied) 30 Collection area for brick concrete, light concrete

(shall not contain cables, plastic, paper and tiles, etc) (bags must be emptied) 31 Collection area for clean soil (bags must be emptied)

32 Sorting area storage room 33 Sorting area storage room 2 34 Composting management office 1 35 Composting management office 2

34

35

50

0 20 100 200 m

Origional site plan

(6)

2. Architectural vision

On the level of architecture and on the level of landscape, Grønmo will be constructed as a new meeting area between the natural environment and the man-made artificial landscape. Grønmo will be given new identity through good coexis- tence between recreation, learning, municipal engineering facilities and new recycle material treatment.

In the new Grønmo park, Grønmo will be strengthened as an attractive gateway to Østmarka;

Grønmo will be a meeting place with good recreational and natural experiences for all age groups, year-round;

Through different experiences, Grønmo will inspire public for greater environmental commitment.

(7)

3. Program

List of new activities in Grønmo

- Kids’ learning path - 2nd hand flea market - Compost soil market - Waste material recycling - Birds watching

- Scenery viewing - Cafe & restaurant - Composting visit - Hiking

- Bicycle group meeting - Campfire festival

- Winter activities: Christmas tree market skiing

skating - Summer activities: picnic swimming fruit pick up kite festival A.Visitor center, 810 m2

Restaurant and Cafe Small auditorium Small exhibition space Office

B. 2nd hand flea market, 1336 m2

Outside space: temporary market space Inside space: market shops

offices

meeting rooms storage

equipment rooms C. Material recycling area, 9100 m2

Outside space: roof

Inside space: material collection containers area administration office

storage

equipment rooms D. Composting area, 21385 m2

Operational equipment space Curing and compost storage Raw material storage

Composting pad

E. Material sorting and treatment area, 9700 m2 Outside space: roof

Inside space: Material sorting and treatment area Operational office

F. Landscape areas

Public area: parking area scenery platform gathering space skating plate landfilled park

Infrastructural landscape: warm water pond oxidation pond enhancement pond leachate water pond clean water pond wetland area

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 HOURS IN GRØNMO KITE FESTIVAL

FRUIT PICKING UP PICNIC SKATING

KIDS SKIING PLAYGROUND CHRISTMAS TREE MARKET BICYCLE GROUP MEETING CAFE & RESTAURANT

COMPOSTING VISITING HIKING

BIRDS WATCHING SCENERY VIEWING MATERIAL RECYCLING 2ND HAND MARKETPLACE KIDS’ LEARNING PATH

SWIMMING

family couple elder worker students scholars

WINTERALL

SEASONS

SUMMER

(8)

4. Scientific research

Research about composting process and organization

composting pad (pad slope graded to 2-4%) diversion channel and dike

dike

holding pond or infiltration area pad runoff collec- tion channel

sedi- ment trap raw material

storage curing and com- post storage diversion

channel and dike diverted

runoff sorting grinding or

shredding

mixing primary

material amendments

repetitive operation

raw material storage

windrow or pile formation

curing

screening or shredding

compost

storage end use

bagging and shipping

oversized materials from screen active composting

aeration, turning, monitoring, ordoe control, and so on diverted

runoff diverted

runoff

composting pad (pad slope graded to 2-4%) diversion channel and dike

dike

holding pond or infiltration area pad

runoff collec- tion channel

sedi- ment trap raw material

storage

curing and com- post storage diversion

channel and dike diverted

runoff sorting grinding or

shredding

mixing primary

material amendments

repetitive operation

raw material storage

windrow or pile formation

curing

screening or shredding

compost

storage end use

bagging and shipping

oversized materials from screen active composting

aeration, turning, monitoring, ordoe control, and so on diverted

runoff diverted

runoff

Research about the landfilled

WASTE

TOP COVER

GAS EMISSION

GAS STATION

GAS PUMP

HIGH POWER EL LINE RAIN WATER

VERTICAL GAS WELL

HORIZONTAL GAS WELL

GROUND WATER WELL TRANSPIRATION

EVAPORATION

LEACHATE WATER

LEACHATE WATER PIPE INFILTRATION OF SEWAGE INTO GROUNDWATER

PRE TREATMENT PURIFICATION OSLO FJORD +

DRAIN STROKE STREAM WATER

STREAM WATER INTERCEPTING

GROUND WATER GROUND WATER

Planting soil Barrier protection

material Well head Lateral pipe

Suction delivers gas to the purification plant

Landfill cap

Gas vent layer

Impermeable plastic liner Drainage layer Intermediate

soil cover Trash

Picture source: New Yourk City Sanitation Department Perforated end cap

Landfill gas End

cap

(9)

5. Design concept and diagrams

Grønmo border forest

Artificial nature inside of the site

This project aims to transform the Grønmo area with large existing rubbish collection zones into a recreational park. At the same time, the current rubbish functions, material recycling, material composting and material sorting will be kept and be converted sustainable within the idea of the public park. The whole Grønmo area is around 42.5 hector. This transformation will reaffirm the qualities of river, forest, field site with the concept to infill new experiences into the area.

There could be new activities in this area, including recycling learning classroom, birds watching, hiking, campfire festival, bicycle group gathering, picnic, Christmas tree market etc. This transformation project includes new organisation system of material collection, 2nd hand market, new organisation system of material sorting, new organisation system of material composting, visitor centre and new system of contaminated water filtering. To be able to connect the area to the existing morphology and natural environment of South eastern of Oslo, this project is part of the effort to turn the contaminated areas around Oslo into a new landscape scenery. The task of the thesis is on the crossing section of landscape design, architecture infrastructure design and architecture design.

(10)

Design concept: devision about the function zones

Design concept: inserted functions inside of the man-made landscape Design concept: boundary around the site

Design concept: man-made slope

(11)

Vehicle road Car parking

Water pipes Gas pipes Gas houses Water drainage Gas well

Recreational path

Oxidation pond and enhancement pond Landfilled leachate water pond Clean water pond Stream

Analysis: vehicle road and parking Analysis: recreational path

Analysis: underground facilities layout Analysis: water system

Water pipes Gas pipes Gas houses Water drainage Gas well

Vehicle road Car parking

Recreational path

Oxidation pond and enhancement pond Landfilled leachate water pond Clean water pond

Stream

(12)

6. Architectural drawings

(13)

Site

(14)

1

2

3

4

5

6

WSW

S Wind direction distribution in Year

10 NNW

SSE 12

E 8 14

2

ENE N

WNW NW

NNE

4

ESE NE

0

SSW

SE W

6

SW 0 20 50 100 200 m

1. Material recycling building 2. 2nd hand flea market

3. Material sorting and treatment building 4. Visitor center

5. Scenery platform 6. Composting building

Site plan

(15)

1

2 3

4

5

6 8

9 10 11 12

13

14

15

16

17

18

19

20

21

22 23

24 25

25

25 26

27 27

27

7

WSW

S Wind direction distribution in Year

10 NNW

SSE 12

E 8

14

2

ENE N

WNW NW

NNE

4

ESE NE

0

SSW

SE W

6

SW 0 20 50 100 200 m

Master plan

01. Parking for public 02. Material recycling building

03. Parking for staff in material recycling building 04. 2nd hand flea market

05. Parking for 2nd hand flea market

06. Entrance for material sorting and treatment building 07. Material sorting and treatment building

08. Exit for material sorting and treatment building 09. Operational office

10. Toilet

11. Wheelchair Accessible restroom 12. Equipment room

13. Warm clean water pond 14. Visitor center

15. Man-made scenery platform 16. Forest

17. Oxidation pond 18. Oxidation pond 19. Enhancement pond 20. Enhancement pond 21. Leachate water pond

22. Wetland pollution collection area 23. Tunnel for composting

24. Operational equipment space 25. Raw material storage 26. Composting pad

27. Curing and compost storage

(16)

Section

50 m 0

2 0 1 5 0

135524440878514300

655088053030100019385

Section

50 m 0

2 0 1 5 0

1000300500010001000139805680 1000300940227771200120013480

(17)

Material recycling building plan

50 m 0

2 0

1

0 5

0 1 9

8

B

C

2 1 1

1 F

4 1 3

1 C

B

15 A

16 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

G G

D

E

F E D A

17 7

6 5

4 3

2

3307 1976 3307 11175

2823

10000

1250 1976

2500

3307 1976

3307

1995

2175

177855

9750 8826

2500 2500

1976

1976 1337

1976 1976

10830 2300

18725 4000

2450 1791

48193012 9750

3307 1976

3307 8000

1976 3307

3307

9500

10000

760512035

5427 8700

18875 10000

10000 10000

10000 10000

10000

1335 1985

4820

59200 2000

250010748615 97502500

1976 3307

9500

5963 3307

1976 1976

9500

14090

7501 10000

9575 87840 10000

22985

8000

950022985 95009500 19879

10000 10000

9500

10000 10000

18630

2185

6160 4250

19100

200025002837885 2535

3307 1976 3307

3307

47152000

9750282712037

1000 15175

19680

1 2

3

4 5 6 7 8 9 10 11 12 13 14 15 16 17

18

19

20

21

22 23

24

25 26

9580150801000300170030010001200 1428010001200300858017001200300

Material recycling building section

50 m 0

2 0 1 5 0

01. Entrance for private cars 02. Entrance for trucks

03. Collection area for Hazardous waste 04. Collection Container for Plaster 05. Collection Container for Mattresses 06. Collection Container for Impregnated wood 07. Collection Container for Metal

08. Collection Container for Plastic

09. Collection Container for Waste electricity equipments, appliances, cables 10. Collection Container for cardboard and paper

11. Collection Container for combustion 12. Collection Container for normal wood 13. Collection Container for hard shell

14. Collection Container for vinyl flooring and vinyl insulation 15. Collection Container for garden waste for composting 16. Collection Container for fluorescent lights

17. Collection Container for glass 18. Containers collection and storage area 19. Tracks for private cars

20. Exhibition and guidance area

21. Administration office and supervision area 22. Toilet

23. Wheelchair accessible restroom 24. Equipment room

25. Exit for trucks 26. Exit for private cars

(18)

Material recycling building interior view

(19)

Plantings SoilFilter fabric Resevoir layer

Moisture-retention layer Aeration layer

3 layers of xps rigid insulation; joints staggered horiz and vert Drainage layer

Root barrier Protection course Air, water, vapour barrier 250mm concrete structure 25mm metal furring

12mm gypsum board (painted on interior side) Interior

Exterior Mullion

Double glazed curtain wall 100mm ventilation space Zinc panel cladding 50mm air space 12mm gypsum board

100mm fiberglass batt insulation Air, water and vapour barrier 250mm concrete structure Air, water and vapour barrier 100mm fiberglass batt insulation

Metal flashing Retention tee

3mm aluminum papapet capping Fiberglass batt insulation

Metal flashing Sealant bead Sealant bead Perforated panel

Aluminum ventilation flaps

Detail 1:20

(20)

0 2 0

1 5

0 50 m

17 16

15 14

13 12

11 10

9 8

7 6

5 4

3

2 18

1

A

B

C

D

E

F

G G

F E D C B A

17 16

15 14

13 12

11 10

9 8

7 6

5 4

3

2 18

1

4750

4750

10000

6200 9550

10000

500

10000

4750

1900

5250 4750

1900

4750500

4545

10000

6200

300

10000 17680

183050

4950

1900 1900 6200 1900

4750

10000 10000

10000

6200 1900 1900

10000 1900 6200

1900

4750

1900

10000

11100 1025

10000 14870

1900 6200

5250

1900 1900

4750

6200

5250 4750 5250 10000

4750

5004750

5250

10000

4750 10000

5250

10000 10000

4750 10000

5250 10000

4750 5250 1900

1900

4750 6200

5250 4750

1900

5250

83090

4750 4750

6200

8350 1900

2605 1900

9195

22840

6200

15120 1900

1025 1900 6200

10000

1900

4750

1900

4750

1900

2869

1900 6200

17970

1900

10000

10875

17000

6030

10000

1900 5900

13030 5250

6200

4750

500

5250

4750

5250

3000

1

2

3

4

5

6 7

8

9

Material sorting and treatment building plan

Material sorting and treatment building section

01. Entrance for trucks

02. Material sorting and treatment area 03. Tracks for trucks

04. Entrance for staff 05. Administration office 06. Toilet

07. Wheelchair accessible restroom 08. Equipment room

09. Exit for trucks

12003070

10751000448032251000 1000

10810 146709410

50 m 0

2 0 1 5 0

(21)

1. Small auditorium 2. Kitchen

3. Restaurant and Cafe 4. Toilet

5. Small exhibition space 6. Entrance

7. Platform

Visitor center plan

5

0 1 2 10m

7 6

B 5

C B

4

C A

1

3

2 3

2

5 4

1

6 7

A

8680

3367

300 8622000 9480

38503488

17710 8680

20008502000300 10002950 7050 15000 13560

1000612

8680 53880

88820002950837913 7050

3800 5963 8680 8680

8680

1 2 3 4 5 7

6

6

37463004450137850023685250

Visitor center section

50 m 0

2 0

1 5 0

(22)

Visitor center exterior view

(23)

8. Temporary market space (Christmas tree market, compost soil market) 9. Entrance

10. Lobby and Reception 11. 2nd hand market space 12. Storage

13. Workshop and repair room

14. Management office

15. Wheelchair Accessible restroom 16. Toilet

17. Kitchen 18. Cafe

19. Outside cafe

60005005200300

1 2 3 9

9

4 A

C 8

7

5

6 5

6 B

4 3

7 2

1

8 C

B A

9193

4650 10093

9000

36250 3200

1000 36250

400

1000 4850 4650

9000 9000

4650 1000 1000 4400

9907 9000

600

3407 4850 4650

900090003150 18300 9000

2250

9000

300

9000 9000

200014501450200030022503150315077520003663200078720007753150

73000

8 9

9

10 11 12 13 14 17 18 19

15 16

2nd hand flea market plan

5

0 1 2 10m

2nd hand flea market section

50 m 0

2 0

1 5 0

(24)

2nd hand flea market exterior view

(25)

2nd hand flea market semi-exterior view

(26)

Wetland area view

(27)

Scenery platform view

(28)

Material sorting exterior winter view

(29)

7. Model photos

1:3000 Site model

(30)

1:1000 Model

(31)

1:1000 Model

(32)

1:1000 Model

(33)

1:200 2nd hand flea market model

(34)

1:200 visitor center model

(35)

Referanser

RELATERTE DOKUMENTER

If the HW corrected camera with 0.05 pixel residual keystone is being used to capture a much brighter scene (five times more light), then the misregistration errors caused by

3.1 Evolution of costs of defence 3.1.1 Measurement unit 3.1.2 Base price index 3.2 Defence inflation and investment cost escalation 3.3 Intra- and intergenerational DSI

A linear increase in the storage modulus was also observed for the anhydride-cured composite, as shown in Table 4.3 and Figure 4.5, where the value increased from 2990 MPa for the

In the present case, UDFs are used both for extracting information from the turbulent velocity field for input to the model and for calculating the evaporation rate; the

Supplementary Materials: The following are available online, Figure S1: Superposition of the suvorexant binding mode in OX2R determined by X-ray (colored in magenta, PDB ID: 4S0V)

While regular tasks associated with traditional milking disappear, milking becomes a continuous around the clock process, and non-routinised tasks may show up at any time. This has

Innovation and development of new payment systems that satisfy new needs are important to maintaining efficiency in the Norwegian retail payment system over time. This requires

The material for this article is a document analysis of responses to the consultation round for the White Paper (Fiskeridepartementet, 2015) proposing a new system for regulating