IP - Initial PeriodEP - Extension Period Licence round 24
3
0
0
Fulltekst
RELATERTE DOKUMENTER
[r]
Decision: Concretize (BoK) or Drop 2 2 Conceptual studies Decision: Continuation (BoV) or Drop. 3 1 Prepare development plan Decision: Submit PDO
[r]
1 2 EM feasibility study Reprocess 3D seismic (include feasibility study for co-processing of modern 3D seismic with legacy 3D seismic and evaluate acquisition of new
[r]
[r]
The well shall be drilled to Lower Cretaceous (Kolmule formation) or to minimum 1500 m total depth.. The drilling commitment shall be fulfilled within three years of the
A licence for the operation of local radio services shall be granted for a period of five years. The Ministry may extend the licence period in special cases.. Allocations of