The site

(2)

idrettsforbundet.no Under prosjektering eller bygging

Standard idrettshaller (43 x 24 m) Baskethaller (32 x 20 m)

Volleyballhaller (24 x 16 m) Private idrettshaller (43 x 24 m) Under prosjektering eller bygging

idrettsforbundet.no

Site regulated for a multipurpose hall I chose the site based on idrettsforbundets overview of planned and existing sports facili- ties in the municipality of Oslo.

In Furuset a new multi purpose hall are plan- ned to support a new elementary school in Verdensparken.

(3)

Aerial photo of site Aerial photo of site

(4)

Forslag om klimaeffektiv byutvikling, 2014 Illustrasjon: Plan- og bygningsetaten Furuset ble bygget ut som en drabantby på 70-tallet.

Historisk kart 1971

Historisk kart 1984

(5)

Proposed new regulation plan Illustration: Plan- og bygningsetaten

Site

T4 consists of two sites.

They are together regulated for a new multi purpose hall in Furuset, a new elementary school and a kindergarten. The existing school, ready for demolition, is located on the southern site.

A part of the school for younger kids and a small kindergarten, ready for demolition, is located on the norhern site.

Site: the new verdensparken elementary school

Site: old/existing gran school Site: old/existing gran school and kindergarten

regulation plan- new Furuset center

Illustration: Plan- og bygningsetaten Site: facing verdensparken

Chosen site - proposal

The multi functional hall will be given a promi- nent connection to Verdensparken along the green/blue axis from Furuset center.

(6)

9

5 6

7

1 3

4

2.3 8

2.1/2.2

Site photos

4 3

5 6

1 - parkour park

2.2 the school has moved to a new location

2.1 - existing building on site

2.3 - facade towards north- south axis

7 8

9

(7)

Lekepark

Barne og ungdomsskole T-bane

Idrett

Kjøpesenter varehus Helse bo og rehabilitering

Bolig Kontor

Fabrikkbygning Moske

Existing situation

Barne og ungdomsskole T-bane

Idrett Kjøpesenter varehus

Helse bo og rehabilitering Bolig

Kontor Moske

Planlagt regulering

The new regulation plan for Furuset

(8)
(9)

Barne og ungdomsskole T-bane

Idrett Kjøpesenter varehus

Helse bo og rehabilitering Bolig

Kontor Moske

Planlagt regulering

(10)

Regulations on site:

1. Can not build to cover the stream Kur- landsbekken that cross the site.

2. Entrance must be orientated from Fu- rustien (north- south axis)

3. Maximum building height is 17,5m above terrain.

4. Minimum of 60 % of surfaces, including roof must be covered by vegetation.

Qualitative notes on the site:

1. A clear north-south axis

2. Transverse axis towards the new Gran school.

3. Local qualities in Verdensparken:

• parkour park

• focus on edible plants

• playground and water installation in the north end of the park.

• gathering spots with bomfires

4. A close connection to a new elementary school

5. Park terrain slopes into a bowl 6. The park situation invite a visual and

physical openness concerning the aciti- vity in the building.

7. The buidling negotiate a relationship between the park and the north-south axis

4 3

7 3

3

2 1

(11)

21 MAR 7:00

21 MAR 14:00 21 MAR 15:00 21 MAR 16:00 21 MAR 17:00 21 MAR 18:00

21 MAR 13:00 21 MAR 12:00

21 MAR 11:00 21 MAR 10:00

21 MAR 9:00 21 MAR 8:00

Sun path diagram - December 21st

Note: Sunlight hours include terrain and building obstru- ctions on site

Sun path diagram - June 21st

08:00

08:00

10:00 12:00

12:00

12:00 17:00

17:00

14:00

Sun path diagram - March 21st

(12)

Ny flerbrukshall

Strategy 1: narrow and long volume

Ny flerbrukshall

Strategy 2: compressed and wide volume

(13)

A north- south orientation:

• Preserves the most park area

• Follow the direction of the activity axis

• A narrow building volume is beneficial for sidelighting

• Connects well with the park and the north- south axis

Referanser

RELATERTE DOKUMENTER

Figure 5-22 Area for Norwegian battle tank squadron from an aerial photo (1999) and ALFRED images. (Flyfoto : Copyright Fjellanger Widerøe A/S / ALFRED

The speed of the striation patterns along an array can be related to the target speed, taking account of the target’s track with its offset and course in relation to the

Next, we present cryptographic mechanisms that we have found to be typically implemented on common commercial unmanned aerial vehicles, and how they relate to the vulnerabilities

The four main areas of research in BAS 8 are support to the Armed Forces from the civil sector, critical infrastructure and critical societal assets, crisis management exercises

Since the MetaSUB method, when used as an integrated element of the end-to-end MetaSUB method, involves intermediate separation of the filter extract into a pellet (subjected

This report documents the experiences and lessons from the deployment of operational analysts to Afghanistan with the Norwegian Armed Forces, with regard to the concept, the main

The Afghan National Police is considered an important security provider, and the impression of the Afghan National Security Force (ANSF) is still good.. The overall perception of

In the present case, UDFs are used both for extracting information from the turbulent velocity field for input to the model and for calculating the evaporation rate; the